Instructions / Assembly

INSTALLATION INSTRUCTIONS: RV-SERIES DOUBLE 27 & 35 QT. WASTE CONTAINER PULLOUTS
Remove the waste container
frame from plastic packaging.
Place the wire frame on a at
surface and attach
wire uprights in the
appropriate holes in the frame
(See Figure A).
Once both uprights are rmly
in place, attach both cross
members to uprights (See
Figure B).
NOTE: Plastic clips should be
on the inside of the frame.
12400 Earl Jones Way
Louisville, KY 40299
rev-a-shelf.com
Customer Service: 800-626-1126
RV-SERIES DOUBLE 27 & 35 QT. WASTE CONTAINER PULLOUTS
I-RVKD -1217
STEP 1
STEP 2
STEP 3
FIG. A
FIG. B
1
8
TOOLS REQUIRED:
10-15 MIN
ESTIMATED ASSEMBLY TIME:
CARE AND MAINTENANCE:
Clean with a damp cloth and
wipe parts dry.
Parts List
No. Description Qty
A 27 or 35 Qt.Waste Containers 2
B Frame 1
C Braces 2
D Basket Wires 2
E Handle 1
F #8 x 3/4” Truss Head Screws 4
A.
27 Qt.
35 Qt.
or
B.
C.
D.
E.
F.

Summary of content (4 pages)