Installation Manual User guide

21
4.6 Applying Self-Levelling Cement
Fig. 4.6
Measure the cables electrical and insulation resistance and record the
readings on line 3) Before embedding the heating cable in self-levelling
cement of the measures’table.
• Consult the manufacturer’s instruction for the type of oor covering (ceramic,
linoleum, or other). See Section 7, ”Expert Tips”;
• Completely embed the heating cable in self-levelling cement (Fig. 4.6). It is crucial
that the ENTIRE cable be embedded. No part of the cable must be exposed;
• Level the suboor with self-levelling cement or cover the cable with a layer of
cement glue when installing the stones or ceramics.
IMPORTANT!
Do not turn on the EFMA oor heating system before the cement has completely
dried. Follow the manufacturer recommandations (may take up to 30 days, depending
on the product).
Once the cement or binder has dried, measure the cables electrical resistance
and record readings on line 4) Aer embedding the heating cable in cement
of the measures’table.