Installation Manual User guide

22
Final view
self-levelling
cement
cement glue
floor covering
4.7 Connecting the System
IMPORTANT!
e system must be connected by a master electrician.
Cold lead
- 240V/208V connection: - 120V connection:
Line 1–Black Line–Black
Line 2–Red Neutral–White
Bare wire–ground Bare wire–ground
Measure the cables electrical resistance and record the readings on line 5)
Upon installing the thermostat of the measures’table.
4.8 Measuring Resistance and Measures’table
• e master electrician who installed and connected the EFMA system must
complete the measures’table (this label is available at the opening of the product)
and give it to the customer. is sheet must be kept near the electrical service.
IMPORTANT!
If this table is not duly completed, the warranty may be annulled. Warranty terms are
set out in Section 8.