Installation Manual User guide

26
7. Expert Tips: Installation and Floor Covering
7.1 Installation Tips
• For multilayer wood ooring (engineered oor) or linoleum, it is recommended
that you consult the manufacturer to verify whether these oor coverings are
compatible with a oor heating system;
• Keep the strips of berglass mesh cut during installation and, as necessary, place
them over the heating cable if you have detached it from the mat and laid it out by
hand (Fig. 7.1);
• ough unlikely, the oor temperature sensor may need to be replaced. REZNOR
recommends installing a exible plastic tube from the sensor to the thermostat on
the wall;
• Fasten the cold lead and oor sensor to a concrete suboor with adhesive (hot glue,
tape, recycled EFMA mesh section).
heating cable
self-adhesive
staple
Fig. 7.1 a
7.2 Floor Covering Tips
• It is strongly recommended to coat the suboor with a sealer before spreading the
self-levelling cement (which is very liquid). is is to prevent any leaks under the
oor;
• e use of a latex primer on a concrete suboor is recommended to ensure the self-
levelling cement adheres better to the concrete;
• With multilayer wood ooring (engineered oor), applying a minimum 5 mm
(
3
/
16
”) layer of self-levelling cement on the heating cable is recommended. To
completely embedded the cable in the cement or cement glue;
• To increase mat stability when unrolled, you may apply a second layer of spray
adhesive to the concrete surface;
• It is important to respect the drying times recommended by the manufacturer to
prevent residual moisture from aecting the adherence of oor coverings such as
vinyl, linoleum, or wood.