Installation Manual
9
Figure 4. Rigging & Hoisting
LIFTING
BEAM
CABLE OR CHAIN
SPREADER
BAR
SPREADER
BAR
BASE
RAIL
BASE
RAIL
Top of unit
to be
unobstructed
Recommended Clearances
for Servicibility
Minimum Required
Clearances to Combustibles
36"
36"
36"
36"
48"
48"
60"
48"
Figure5.UnitClearanceRequirements
Figure 7. Concrete Mounting Pad
3” min
Figure6.RoofCurb
Roof
Curb
B, or C roof covering material as long as the following
requirementsaremet:
• Ifusingsidesupplywithreturnairducts,thehorizontal
discharge kit must be installed prior to unit installation.
• Ifusingbottomdischargewithreturnairductsaroofcurb
must be installed prior to unit installation. See Rigging
and Hoisting section on page 8 for setting of the unit.
Rooftop Mounting
Rooftop installations must be located according to local
buildingcodesorordinancesandtheserequirements:
• Theroofmustbecapableofhandlingtheweightofthe
unit. For unit weights, see Table 3 (page 27). Reinforce
the roof if necessary.
• Theappropriateaccessoryroofcurb(Figure6)mustbe
installed prior to unit installation. The roof curb must be
square and level to ensure proper condensate drainage.
Pleasefollowallinstructionsprovidedwiththekit.
WARNING:
Neverdrillorpunchholesinunitbasewhen
installingdownowunits.Leakagemayoccur
ifbottompanispunctured.
• On bottom discharge applications, the supply and
return air ducts must be attached to the roof curb duct
supports, not the unit. Install all ductwork before setting
unit on curb or frame.
• Framesupportmustbeconstructedusingnoncombustible
materials. Full perimeter support is required under the
unit. Supports must be made of steel or weather resistant
wooden materials. The unit must be square and level
to ensure proper condensate drainage.
• Theframemustbehighenoughtoensureprevention
of any moisture from entering the unit. Recommended
height to unit base is 8” (20cm) for both Downflow and
Horizontal installations.
• Secure roof curb or frame to roof using acceptable
mechanical methods per local codes.
Ground Level
Ground level installations must be located according to
localbuildingcodesorordinancesandtheserequirements:
• Clearancesmustbeinaccordancewiththoseshown
in Figure 5.
• Aconcretemountingpad(Figure7)mustbeprovided
and separate from the building foundation. The pad
must be level to ensure proper condensate disposal
and strong enough to support the unit’s weight. The slab
height must be a minimum of 3” (8cm) above grade and
with adequate drainage.
• Units require horizontal supply and return kit for
horizontal installations.
• Ductwork should be attached directly to anges on
panels supplied in horizontal duct conversion kits.