Installation Manual Owner manual

I-RDF, PN148384R5, Page 8
FIGURE 6 - Divider Locations for
Bottom Ductwork Openings
NOTES:
Drawing is not proportional for all sizes.
3/4" (19mm) measurement is the width of the
anges where the roof curb mates with the
heater. Flange surface must be sealed.
When cutting duct openings in the roof, cut
opening(s) 1” (25mm) larger than duct size
opening for installation clearance.
5.0 Mounting
(cont'd)
5.4 Mounting on a Roof Curb (cont'd)
Roof Curb Duct Opening Dimensions (± 1/8" or 3mm)
Sizes 1-20, 1-40, 1-50, 1-65 2-80, 2-120 3-180, 3-260
inches mm inches mm inches mm
A 23-11/32 593 28-13/32 722 38 965 A
B 20-1/8 511 28-11/32 720 38 965 B
C 5 127 13-15/32 342 11-19/32 294 C
D 10-1/4 260 7 178 4-5/8 17 D
E 25-1/2 648 54-11/16 1389 66-3/4 1695 E
F 11-1/2 292 17-23/32 432 20-1/16 510 F
G 11-15/32 291 8 203 10-15/32 266 G
H 11-1/32 280 11-3/32 282 17-1/4 438 H
3. If the system has a bottom discharge and/or a return air inlet, use the sheetmetal
screws to sub-assemble the dividers. Refer to the dimensions in FIGURE 6 to
appropriately position the roof curb dividers to create the needed duct opening
anges. Attach the dividers to the roof curb with sheetmetal screws. NOTE: If the
system does not have a bottom discharge and/or a return air opening, the dividers
for an opening that is not going to be used may be installed but are not required.
4. Check the assembly for squareness. The curb must be adjusted so that the
diagonal measurements are equal within a tolerance of ± 1/8".
5. Level the roof curb. To ensure a good weatherproof seal between the unit curb
cap and the roof curb, the roof curb must be leveled in both directions with no twist
end to end. Shim as required and secure curb to the roof deck before installing
ashing.
6. Install eld-supplied ashing.
7. Before placing the RDF unit on the curb, apply furnished 1/4" x 1-1/4" foam sealant
tape to the top perimeter surface of the curb, making good butt joints at corners.
The sealant tape must be applied to the curb rails to prevent water leakage into
the curb area due to blown rain and capillary action.
Also place the foam sealant tape on the perimeter of the top surface of the duct
opening(s), being sure to make good butt joints at corners. If installing ductwork
from the top, it is recommended that tape be put on again after the ductwork is
"dropped in", sealing below and above the duct anges.
Roof Curb Installation Instructions (cont'd)