Install Instructions

Table Of Contents
16
I-UBX-UBZ-UDX-UDZ (04-21) 1034344-0
INSTALLATION
Unpacking and Inspection
The unit was test-operated and inspected at the factory prior to crating and was in operating condition.
It is important to note when uncrating the unit that shipping brackets are attached with cabinet screws. When
removing shipping brackets, re-insert ALL screws into the cabinet.
If, upon removing it from its crate, the unit has been found to have incurred any damage in shipment, document
the damage with the transporting agency and contact an authorized Factory Distributor. If you are an authorized
Distributor, follow the FOB freight policy procedures.
Pre-Installation Checklist
Check the rating plate for the gas specifications and electrical characteristics of the heater to ensure that they
are compatible with the gas and electric supplies at the installation site.
Read this manual and become familiar with the installation requirements of your particular heater.
If you do not have knowledge of local requirements, check with the local gas company or any other local agencies
who might have requirements concerning this installation.
Before beginning, make preparations for necessary supplies, tools, and manpower.
Field-removal of heat exchanger tube support—unit sizes 030–125 (optional): in some cases, the heat
exchanger tubes may have shifted during shipment, causing vibration noise against the support during unit
operation. The primary function of the heat exchanger tube support is to support the heat exchanger tubes during
shipment. This support can be removed without affecting the operation of the unit. It is recommended that the
support be removed prior to installing the unit as follows:
a. Remove discharge air louvers, taking care not to lose springs.
b. Remove and discard two screws that secure heat exchanger support located on top of unit.
c. Remove heat exchanger support through discharge opening and discard support.
Reinstall discharge air louvers.
Check to see if there are any field-installed options (refer to Table 13) that need to be assembled/installed
prior to unit installation. Ensure that all options ordered are at the installation site. Instructions are in this
manual or in the option package (option packages are shipped separately).
Table 13. Field-Installed Options
Name Code Description
Vent/combustion air inlet terminal kit
CC2 Vertical roof vent
CC6 Horizontal through-wall vent
Vertical louvers CD1
Downturn nozzle
CD2 25- to 65-degree variable air deflection range
CD3 50- to 90-degree variable air deflection range
CD4 25- to 65-degree variable air deflection range nozzle with vertical louvers
Manual shutoff valve CE1 Natural gas or propane
Stepdown transformer
CG1 208V/115V
CG2 230V/115V
CG4 460V/115V
Hanger kit
CK8 Adapts 3/8-inch hangers for two-point suspension from 1-inch threaded pipe
CK10 Adapts 3/8-inch hangers for four-point suspension from 1-inch threaded pipe
CK22 Angle brackets for Low ceiling mounting (does not include hanger rods)
High-elevation conversion kit DJ20 For installations at elevations >6000 feet