Install Instructions

Table Of Contents
42
I-UBX-UBZ-UDX-UDZ (04-21) 1034344-0
MAINTENANCE—CONTINUED
Maintenance Procedures—Continued
Venter Motor and Wheel Assembly Maintenance
NOTES:
Venter motor bearings are permanently lubricated.
Keep all hardware removed to be used in reassembling and installing the replacement parts.
Remove dirt and grease from the motor casing, venter housing, and venter wheel. Replace the venter motor and
wheel assembly as follows:
1. Turn OFF gas and disconnect electric power.
2. Remove burner/control compartment access panel.
3. Disconnect three venter motor wires at DSI control, capacitor wires at capacitor (if applicable), and ground screw
(located on control panel).
4. Detach gas train: (unit sizes 030 and 045 only):
a. Disconnect gas supply at union outside of cabinet.
b. Mark and disconnect wires at gas valve.
c. Carefully remove burner orifice and orifice adapter locking nut.
d. Slide orifice adapter out through bracket on burner while pushing gas train to right. This will move gas train
out of way.
5. While holding venter motor, remove three or four screws that secure venter motor mounting plate to venter housing.
Remove motor and wheel assembly from heater.
6. Reassemble with replacement venter motor and wheel. Ensure that venter wheel is properly positioned on shaft
(see Figure 19).
7. Reconnect venter wires in accordance with wiring diagram.
8. For unit sizes 030 and 045, reconnect gas supply at union outside of cabinet.
9. Leak test connection using leak detecting solution. If leak is detected, tighten connection. If leak cannot be stopped
by tightening connection, replace part(s).
10. Install access panel.
11. Restore electric power to heater and turn ON gas.
12. Follow instructions on lighting instruction plate to light heater.
13. Check for proper heater operation.
Figure 19. Venter Motor and Wheel Assembly
UNIT SIZES 030–100
UNIT SIZE 125
UNIT SIZES 150–400