UDZ Venting Instructions

Table Of Contents
13
CP-UBZ-UDZ-VENT (02-21) 1034632-0
8. Install combustion air inlet (see Figure 11):
a. Install additional section of vent pipe if needed on outside and make joint in accordance with pipe manufacturer’s
requirements.
b. When vent pipe is required height, slide combustion air inlet over vent pipe and fasten collar to combustion
air pipe using sheet metal screws.
c. Seal opening at top between vent pipe and combustion air inlet to prevent water leakage using silicone sealant.
Figure 11. Combustion Air Inlet and Vent Terminal
9. Install exhaust (vent) cap in accordance with APPENDIX.
10. Install indoor combustion air pipe:
a. Secure single-wall combustion air pipe run to collar on concentric adapter box using field-supplied sheet metal
screws.
b. Seal pipe joint using tape or sealant.
11. Verify compliance with Figure 7 and with all specifications listed in Venting and Combustion Air
Requirements section and subsections.
Horizontal Vent Terminal (Option CC6) Installation
Field-supplied components required for installation of the horizontal vent kit are as follows:
Vent and combustion air piping in accordance with Table 3
Tapered vent pipe diameter reducers and/or increasers, as required
Thimble (not required if wall is of non-combustible construction)
• Flashing
Sheet metal screws, tape, and sealant, as required
Factory-supplied components for installation of the horizontal vent kit are listed in Table 8 and shown in Figure 12.
THIRD Install exhaust (vent) terminal
SECOND Install combustion air inlet:
1) Slide combustion air inlet over vent pipe
2) Secure bottom of inlet to combustion air pipe
using sheet metal screws—be sure not to pene-
trate vent pipe
3) At top, completely seal space between vent pipe
and air inlet using silicone
Double-Wall Vent Pipe
12-inch (305 mm) minimum
Note: In geographic areas
where design ambient is
10°F or lower, minimum
height is 24 inches (610 mm)
Single-wall combustion air pipe
FIRST If needed, add
section of double-wall
pipe to reach
minimum height
requirement
Seal completely
with silicone to
prevent water
leakage
Table 8. Horizontal Vent Terminal/Combustion Air Package (Option CC6) Components
Unit Size
Description Qty
030–125 150–400
PN
211762 211763 Kit package 1
211789 211790 Concentric adapter box (see Figure 2, Figure 3, and Figure 4) 1
211791 211792 Exhaust grill (see Figure 12) 1
151755 124940 Inlet guard (see Figure 12) 1
207232 Concentric adapter box bracket 2
37661 Screw, sheet metal, #10-16 × 1/2 8
53335 High-temperature silicone sealant, tube 1