UDZ Venting Instructions

Table Of Contents
8
CP-UBZ-UDZ-VENT (02-21) 1034632-0
Table 4. Vent Pipe Opening Diameter
Vent Terminal Configuration Option
Unit Size
030–125 (5-Inch Vent Pipe)* 150–400 (5-Inch Vent Pipe)*
Diameter (Feet (Meters))
Vertical CC2 4-21/32
(
118
)
5-21/32
(
144
)
Horizontal CC6 4-1/16 (103) 5-1/16 (129)
*See Figure 3.
INSTALLATION—CONTINUED
Concentric Adapter Box Connections—Continued
Table 5. Concentric Adapter Box Vent Pipe Sizes
Unit Size
Dimension*
A B C D
Diameter (Inches (mm))
030, 045, 060**
4 (102) 6 (152) 4 (102)
075, 100, 125
4 (102) 6 (152) 4 (102)
150, 175, 200, 225, 250
5 (127)
8 (203)
6 (152)
*See Figure 4.
**Using 4-inch vent pipe for combustion air runs from heater to concentric adapter box.
Vent Terminal Options
Vent terminal options CC2 (vertical vent configuration) and CC6 (horizontal vent configuration) are shown in Figure
5. Both options are applicable to residential and commercial/industrial installations
Figure 5. Vent Terminal Options
Vertical Vent Terminal (Option CC2) Installation
Field-supplied components required for installation of the vertical vent kit are as follows:
Vent and combustion air piping in accordance with Table 3
Tapered vent pipe diameter reducers and/or increasers, as required
Thimble (not required if wall is of non-combustible construction)
• Flashing
Sheet metal screws, tape, and sealant, as required
Factory-supplied components for installation of the vertical vent kit are listed in Table 6 and shown in Figure 6.
VERTICAL (OPTION CC2)
HORIZONTAL (OPTION CC6)
Field-supplied
requirements: