Operating instructions
1104UESAGBEN, page 7/31
The heater is supplied with four point suspension. All points must be used.
Threaded nut inserts are provided on each side of the top panel of the heater.
See fi gure below.
5. HANGING THE
HEATER
Before suspending the heater check the supporting structure to be used to
verify that it has suffi cient load-carrying capacity to support the weight of the
unit. Suspend the heater only from the threaded nut inserts. Do not suspend
from the heater cabinet.
When the heater is lifted for suspension, leave the unit on the pallet. Before
hanging, verify that all screws originally used to fi x the shipping supports, are
rescrewed into the cabinet.
WARNING
WARNING
Unit must be level for proper
Unit must be level for proper
operation. Do not place or
operation. Do not place or
add additional weight to the
add additional weight to the
suspended heater.
suspended heater.
UESA 035 055 083 102
kg 148 151 222 230
Table 2:
Weight (kg)
Figure 2:
Suspending the heater
with rods from the
threaded nut inserts
Be sure that the threaded hanger rods are locked to the heater as illustrated in
fi gure 2. Recommended maximum hanger rod length is 1.8m. Where longer
drops are required, ensure that restraints are fi tted to prevent excess lateral
movement and supports are adequately sized.
Add a nut to lock the
M10x1.5 hanger rod to the
heater
Alternatively the unit can also be base mounted on a non-combustible sup-
port. In this case ensure that unit is securely fi xed on the base.