PHYSICAL INSTALLATION
The physical installation of the 3D-iD system involves the placement of 4 com-
ponents. These include, as mentioned in the Installation Planning section, the
Antennas, Cell Controllers and Servers. In addition, tags must be attached to
assets. While extensive documentation on the actual installation of all of these
elements is available in the packaging for each element, a brief explanation of
the installation process is included below. It is generally suggested that the ele-
ments of the 3D-iD system be installed in the following order:
1. Antennas
2. Cell Controllers
3. Antenna/Cell Controller Cabling
4. Tags
5. 3D-iD Server
6. ViewPoint (Client) Software Installations
ANTENNAS
1. Attach the base of the antenna mount to
the wall where the antenna should be
placed. In situations where the antenna is
to be mounted in other types of locations,
such as under a drop ceiling, additional
mounting creativity might be required.
2. Attach the antenna to the mount, and
align it in the manner determined by the
technician during the site survey.
3. The antenna must be installed so that there is at least a 6 inch gap
between it and any possible contact with people. Failure to install it in
this fashion may invalidate the users
license to operate this product.