1. Place the Cell Controller in the location
determined earlier.
2. Ensure that the Cell Controller has ade-
quate ventilation.
3. Attach the power and network cabling to
the Cell Controller.
ANTENNA/CELL CONTROLLER CABLING
For each Cell Controller/Antenna combination:
1. String cable from the Cell Controller towards the Antenna. Leave 1-2 feet
of cable at the Cell Controller. In order to avoid bends or kinks  which
will cripple the accuracy of antenna readings - do not attach the cable to
the Cell Controller.
2. Coil the extra cabling near the antenna to allow for easier movement of
the antenna should the need arise.
3. Connect the cable to both the Cell Controller and the Antenna
4. Label the cable at both ends for future ref-
erence. A potential labeling scheme could
be based on the Cell Controller Antenna
port that the Antenna is connected to.
T
AGS
1. PinPoint 3D-iD tags should be mounted
securely and fixed to the asset. Since the
tags antenna is not omni-directional, try to make certain it is always fac-
ing the same way as the asset moves throughout the facility.
2. Make certain that access to the removable battery cover plate on the tag
is maintained.
3. Tags must always be mounted with THE BATTERY SIDE FACE DOWN
AGAINST THE ASSET. The top of the tag contains the antenna struc-
tures, and it is essential that this side stay facing up in order to ensure
strong broadcast and reception of RF signals.