User's Manual Part 2

DSPbR Series User’s Manual
Document Number 00000.B Page 34/75
4. Installation
4.1 Unpacking
The DSPbR is heavy and considered a two-man lift.
The 19” sub rack frame will have been packed into a robust cardboard box container. All modules ordered with
the initial order will have been fitted and fastened into the appropriate slots within the sub rack frame. The
appropriate AC mains voltage power cord, Ethernet jumper cable and module extraction tool along with this
User Manual in a hard and softcopy CD will have been packed into the same cardboard box container.
There are no feet on the underside of the unit and therefore careful placement “right side up” on a flat surface
prior to mounting is required.
4.2 Mechanical
A single DSPbR sub rack frame will occupy 4RU of 19” rack height. The minimum un-obstructed depth required
within the 19” rack, excluding the additional space required to fit cable terminated coaxial connectors is 439mm.
Top and bottom and side covers of the sub rack frame are not required to be removed for field servicing and
therefore we discourage any attempt to do so