Instructions / Assembly

15
Installation Checklist
A. Water Heater Location
B. Water Supply
C. Gas Supply
Water heater securely anchored.
Indoors and protected from freezing
temperatures.
Proper clearance from combustible surfaces
observed and water heater not installed on
carpeted floor.
Sufficient fresh air supply for proper
operation of water heater.
Air supply free of corrosive elements and
flammable vapors.
Provisions made to protect area from water
damage.
Sufficient room to service heater.
Combustible materials, such as clothing,
cleaning materials, rags, etc. clear of the base
of the heater.
Water heater completely filled with water.
Air purged from water heater and piping.
Water connections tight and free of leaks.
Gas line equipped with shut-off valve, union
and sediment trap.
Approved pipe joint compound used.
Soap and water solution used to check all
connections and fittings for possible gas leak.
Gas Company inspected installation (if
required).
After conversion, be certain the gas
supplied to the heater is the type the
valve has been converted for (LP for
heaters converted to LP use, and natural
gas for heaters converted to natural gas
use)
.
D. Relief Valve
Temperature and Pressure Relief Valve
properly installed and discharge line run
beneath mobile home.
Discharge line protected from freezing.
E. Venting
Flue baffle properly hung in top of heaters
flue.
Gas Vent Roof Jack properly installed.