Specifications

CONNECTIONS PLUMBING
40
SUPPLIED WITH VSI160 SOLAR STORAGE TANK KIT 299662
Item
Part
Number
Description
Item
Part
Number
Description
1
088039
hex nipple ¾” x ½”
6
088144
fitting union ¾” F x ½” C
2
088150
elbow ½” F x ½” M Rye 2503
7
144704
panel mounting bracket
3
088152
braided flexible hose 262 mm long
½” x ½” female cone
8
080031
screw phillips pan HD No 8 x 13 (4 off)
4
088151
elbow fitting ½” M x ½” C Rye 4840
9
080187
screw HD bolt M6 x 12
5
088148
preformed pipe DN15,
insulated with 13 mm diam insulation
Note: Items 1, 2, 4, 6 are in kit 299870, which is part of kit 299651, which is part of kit 299662
Other items supplied in kit 299870, outlined in “Solar Inlet and Outlet” on page 41, are:
2 x 088065 fitting (compression) union ½” C x ½” C Rye 4930
Other items supplied in kit 299651, outlined in “Hot Sensor Lead” on page 44, are:
3 x cable tie mounts
1 x hot sensor gland
9 x cable ties 150 mm x 3 mm
IN-SERIES BOOSTER REMOTE LOCATION
The pipe work between the solar storage tank and the in-series gas booster has a minimum recommended
pipe size of DN20, MUST BE of copper and be fully insulated with a closed cell type insulation or equivalent
in accordance with the requirements of AS/NZS 3500.4.
The insulation must be weatherproof and UV resistant if exposed. The insulation must be fitted up to the
connections on both the solar storage tank and the in-series gas booster. A full flow isolation valve must be
installed on the water line to the in-series gas booster.
TEMPERATURE PRESSURE RELIEF VALVE
The temperature pressure relief valve is shipped behind the lower front cover of the water heater. The
temperature pressure relief valve must be fitted before the water heater is operated. Before fitting the relief
valve, make sure the probe has not been bent. Seal the thread with Teflon tape - never hemp. Make sure the
tape does not hang over the end of the thread.
Screw the valve into the correct opening (refer to the installation diagram on page 32) leaving the valve outlet
pointing downwards. Do not use a wrench on the valve body - use the spanner flats provided. A copper drain
line must be fitted to the temperature pressure relief valve (refer to "Relief Valve Drain" on page 41).
The valve must be insulated with closed cell polymer insulation or similar (minimum thickness 9 mm) and the
insulation installed so as not to impede the operation of the valve. The insulation must be weatherproof and
UV resistant if exposed.
EXPANSION CONTROL VALVE
Local regulations may make it mandatory to install an expansion control valve (ECV) in the cold water line to
the water heater. In other areas, an ECV is required if the saturation index is greater than +0.4 (refer to
“Water Supplies” on page 14).
The expansion control valve must always be installed after the non return valve and be the last valve
installed prior to the water heater (refer to diagrams on page 38). A copper drain line must be fitted to the
expansion control valve (refer to "Relief Valve Drain" on page 41).
The valve must be insulated with closed cell polymer insulation or similar (minimum thickness 9 mm) and the
insulation installed so as not to impede the operation of the valve. The insulation must be weatherproof and
UV resistant if exposed.