Instructions / Assembly
53
Gas Supply Installation
Install the manual gas appliance shut-off valve to the gas
connection at the water heater� The shut-off is supplied
with the water heater�
Install a ground joint union or ANSI design-certified semi-
rigid or flexible gas appliance connector to the open end
of the manual gas appliance shut-off valve� The (NFGC)
ANSI Z223�1 and CAN/CSA B149�1 codes mandate the
use of manual gas shut-off valves�
Install a manual gas supply line shut-off valve to the end
of the gas supply line�
Using the proper-size piping, fittings, and components,
build the gas supply line to the water heater�
NOTICE:
The gas supply line should be a minimum of 3/4-
in. (1.9-cm) black steel pipe or other approved gas
piping material.
Install a sediment trap at the lowest portion of the gas
line�
The inlet gas pressure to the water heater must NOT
exceed 10�5 in� w�c� (2�6 kPa) for natural gas and 13
in� w�c� (3�2 kPa) for LP gas� For purposes of input
adjustment, the minimum inlet gas pressure (with main
burner on) is shown on the water heater rating plate� If
high or low gas pressures are present, contact your gas
supplier for correction�
1
2
4
3
5
INSTALLATION INSTRUCTIONS
Gas Supply