Operator`s manual

Maintenance Section 5-11
MAINTENANCE
FL20MFL14M 10/03
MAINTENANCE
© 2004 Alamo Group Inc.
8. Install driveline yoke onto shaft and install four bolts through yoke spacers #10 and center plate #4. Install
locknuts and tighten.
9. Rotate yoke and center plate so that cotter pin #13 can be installed.
10. Tighten large nut #7 as much as possible by hand. NOTE: Make sure both springs #5 are centered on guide
ring #6.
11. Reinstall washer #15 and castle nut #14. CAUTION: Do not tighten nut #14. Tighten only enough to remove
play between the yoke, washer #15, and nut #14. Install cotter pin.
GEARBOX ARRANGEMENTS (Secondary Gearboxes)
All Three secondary Gearboxes have the same identical parts in them for 540 or 1000 RPM and for the left,
center, or right sections. To change Gearbox from 540 to 1000 RPM, the Gear (#1) and Pinion (#2) must be
reversed. Remove the Gear from the Cross Shaft and the Pinion from the vertical Output Shaft. Install the
Gear on the vertical output shaft and the pinion on the Cross Shaft. Reassemble the Gearbox allowing .008 to
.012 backlash. Repeat this procedure on all three Gearboxes. When removing the Bearings and Gears, do
not mar the Grease Seal Race. Be extremely careful when installing the Grease Seals so they will not be
damaged.
CW ROTATION
P/N 65504AL
Secondary Gearbox
Assembly
1000 RPM Input
CCW ROTATION
P/N 65504AR
Secondary Gearbox
Assembly
1000 RPM Input
P/N 65104AL
Secondary Gearbox
Assembly
540 RPM Input
CCW ROTATION