Specifications

TM 9-2350-311-34-1
10-1 WINTERIZATION KIT INSTALLATION — CONTINUED
a. Installation — Continued
NOTE
Ensure bottom insulation cut-outs are alined with battery tray mounting blocks.
4 Fold up rear battery winterization box (6). Insert through front battery access opening (5) and locate box in rear
battery access opening (4).
NOTE
Ensure box bottom cut-outs are alined with battery tray mounting blocks.
Screw and Iockwasher were removed in step 1.
5 Attach front ground cable (7) to hull front plate with screw (8) and Iockwasher (9).
6 Unfold sides of front and rear winterization boxes (3 and 6) and insert six retainer wires (10) at comers.
7 Secure six straps (11) to rivets (12) with Iockwire (13).
8 Place grommets (14) (hidden) on battery heater (15) inlet and outlet tubes and install heater through front
battery access opening (5). Insert tube grommets in front winterization box (3) cut-outs.
NOTE
Screw and Iockwashers were removed in step 1. Four screws and 16 flat washers are
provided for shimming adjustment of tray to make it level. Use of shims should be kept
to minimum.
9 Install battery trays (16) and attach trays and battery heater (15) to sponsor with eight furnished screws (1 7)
and eight Iockwashers (18).
10-4