Installation manual

4 Benchmark LP Manual
Cable Routing
The cable must be routed to the indicator in a manner that will protect the cable from damage. When planning
cable routing, leave a loose coil of excess cable under the scale to facilitate future lifting of the scale for servicing
or cleaning.
1. When the interface cable is protected and in its final
position, complete connections to the indicator. See
indicator installation manual for wiring information.
2. If necessary, trim corners as described in Section 3.2 on page 5.
3. Check all strain relief for
tightness.
Figure 2-4. Homerun cable wired to summing board and secured with nylon ties