Service manual

Installation 9
2.4 Cage Wall Assembly
2.4.1 Apply the silicone bead
Before installing the walls, a silicone bead must be added.
1. Clean the upper flange of the floor and the lower wall flange with mineral spirits.
2. Apply a 1/8'' bead of silicone along the upper edge of the floor panel along the entire length as shown in
Figure 2-3.
Figure 2-3. Silicon Bead
2.4.2 Install walls
Wall installation should be done with two people or an overhead crane.
1. Lift the first wall by using one sling in the center.
The wall with the holes for the indicator is mounted on the left side.
2. Stand the wall vertical and place the inserts from the wall into the tubes of the cage floor. The more vertical
the wall the easier assembly will be.
3. Repeat for the opposite wall.
4. Install the top cross members.
5. Insert the 3/4 x 3 1/2'' bolts through the cage wall and inserts on the indicator side of the cage, head of bolt
to the inside.
A come-along from the top of the cross member to bottom of the cage corner post may be required. A ratchet
strap is provided in hardware kit.
When both walls are in place, ensure that they are perfectly square. Straps may need to be used to pull for
squareness.
Silicone
Wall Insert
W ARNING
Note
Note