Installation Manual © 2005 Ricoh Printing Systems, Ltd.
Revision Table for manual Rev. for Manual 00 01 Machine Rev. - 02 U5 03 04 05 - 06 07 - Page No.(Contents) Date First Edition Table of Contents ii(01) 2-3(01), 2-4(01), 2-5(01), 4-4(01), 4-15(01), 5-1(01), 5-2(00) to 5-7(00) RoHS Compliance.
© 2005 Ricoh Printing Systems, Ltd. All rights reserved. No part of this document may be reproduced without the expressed permission of Ricoh Printing Systems, Ltd. The material in this document is for informational purposes and is subject to change without notice. Ricoh Printing Systems, Ltd. assumes no responsibility for errors or omissions in this document. No liability is assumed for any damages resulting from the use of the information it contains.
BLANK
Table of Contents SAFETY SUMMARY 1. General Safety Guidelines …………………………………………………………………. Safety-1 2. Hazard Warning Statements ……………………………………………………………… Safety-2 2.1 WARNING Statement …………………………………………………………………. Safety-2 CHAPTER 1. INSTALLATION REQUIREMENTS ........................................1-1 1.1 1.2 1.3 1.4 1.5 1.6 APPLICATION......................................................................................................................1-1 INSTALLATION AREA ...................................
3.1.1 3.1.2 3.1.3 3.1.4 3.2 3.3 3.4 3.5 Removing the Protection Tape and Mat from the Engine.................................................. 3-1 Set the PS Air Filter for the Engine Rear Cover.................................................................. 3-2 Removing the Protection Tape from 2000 Sheet Hopper. ................................................. 3-3 Removing the Protection Tape from 500 Sheet Hopper ; 2 portion................................
SAFETY SUMMARY The hazard warnings which appear on the warning labels on the machine or in the manual have one of the following alert headings consisting of an alert symbol and a signal word, DANGER, WARINIG, or CAUTION. This is the safety alert symbol. It is used to alert you to potential personal injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death. 1.
SAFETY SUMMARY (Continued) 2. Hazard Warning Statements The following are the hazard warning statements contained in this manual. 2.1 WARNING Statement • Leave over than 400mm at the rear of the Printer for ventilation. Otherwise print quality may be degraded. (Section 1.2,Page 1-1) • Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. (Section 2.1,Page 2-1) (Section 2.2,Page 2-6) (Section 2.
SAFETY SUMMARY (Continued) • Observe the speed limit of 300 mm/sec. (1.08 km/hr) when moving device. Do not move device on unleveled floor. Do not tilt device 15 ° or more. (Section 2.1,Page 2-1) (Section 2.2,Page 2-6) (Section 2.3,Page 2-9) (Section 2.4,Page 2-11) • Choose the location to place device where the slope is less than 15 °. (Only left and right direction from view of operator’s side.) (Section 2.1,Page 2-1) (Section 2.2,Page 2-6) (Section 2.
SAFETY SUMMARY (Continued) • Unplug the Power Supply Cable prior to connecting. (Section 4.1,Page 4-4) • Be careful not to have other personnel plug in the power cable while performing the connecting. (Section 4.1,Page 4-4) • Be sure to use power supply cable which complies with the following specification : Power plug rating ; Min. AC 250V, Min. 15A (2-Pole, 3-Wire, Grounded) 6-15P UL Listed, CSA Certified in North America Type CA, Conformed to IEC 950 in Europe Power cable rating ; Min.
Chapter 1. Installation Requirements 1.1 Application This specification is applied to the DDP70 Printer for Unpacking, Installing and Adjustment. 1.2 Installation Area Installation area is shown in Appendix 1.1–1.12 corresponding to Table 1.1. Table 1.1 Installation area Finisher Transit Pass Unit Type DDP Finisher SR5000 Appendix Printer 1.1 X X 1.2 X X 1.3 X 1.4 X 1.5 X 1.6 X 1.7 X X 1.8 X X 1.9 X X X 1.10 X X X 1.11 X X X 1.
1.4 Tools Required Table 1.2 Tools Required Item Name 1 Cutter 2 Phillips Screw Driver NO.2 shaft length; approx. 40 and 100mm 3 Adjustable Open End Wrench 4 Level Meter Usage Unpacking Removing and installing the screw for covers Leveling the bolt Fixing the leveling the bolts Installation the Container Stacker 1.5 Environmental Conditions Table 1.3 Environmental Conditions Items Value Temperature 10 ~32 °C (50 ~ 89.6°F) Humidity 20 ~80 %RH (Wet Bulb 26 °C (78.8 °F ) max.
Chapter 2. Unpacking 2.1 Unpacking of the Engine WARNING 1) Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. 2) Perform unpacking where there is no dust or water leaking. 3) Do not place heavy objects which weigh 5 kg or more on device. 4) Be careful when lifting device with the forklift so device is well-balanced on the arms of the lift. Also put the packing (cushion) between device and forklift so device is not damaged.
2.1.2 Unpacking Procedures 1) Cut the V Bands and remove the Cap. 2) Remove the screws. 3) Remove the Packing, Accessory box, Ramps, Upper Packing. 4) Remove the Box, Corner Packing.
5) Jack up the Engine by rotating the leveling bolts. Put the wood spacer (It is taken out from the accessories box.) under four leveling bolts. Jack up the Engine by rotating the leveling bolts. Down Up Leveling Bolt 6) Remove the Base Packing. 7) Place all Casters in the same direction. Caster 8) Lower the Engine on the Under Tray and screw the leveling bolts in all the way. 9) Attach the four Ramps under the Platform. 10) Carefully roll the Engine off the Tray.
2.1.
Table 2.2 Parts list in the Accessory Box No.
2.2 Unpacking of the Finisher WARNING 1) Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. 2) Perform unpacking where there is no dust or water leaking. 3) Do not place heavy objects which weigh 5 kg or more on device. 4) Be careful when lifting device with the forklift so device is well-balanced on the arms of the lift. Also put the packing (cushion) between device and forklift so device is not damaged.
2.2.2 Unpacking Procedures [FS-104H] (No RoHS Compliance Unit) 1) Cut the V Bands and remove the Outside Box. 2) Remove the two Upper packing, Accessory Box. 3) Remove the Tape of Protection Bag and take down the Protection Bag. 4) Carefully lift the Finisher by two persons and stand on Floor.
[FS-108R] (RoHS Compliance Unit) 1) Cut the V Bands and remove the Outside Box. 2) Remove the two Upper packing, Accessory Box. 3) Remove the Tape of Protection Bag and take down the Protection Bag. 4) Carefully lift the Finisher by two persons and stand on Floor.
2.2.3 Parts Check in the Accessory Box [FS-104H] (No RoHS Compliance Unit) Table 2.4 Parts list in the Accessory Box No.
[FS-108R] (RoHS Compliance Unit) Table 2.5 Parts list in the Accessory Box No.
2.3 Unpacking of the High Capacity Hopper WARNING 1) Perform unpacking where there is no dust or water leaking. 2) Do not place heavy objects which weight 5 kg or more on device. 3) Observe the speed limit of 300 mm/sec. (1.08 km/hr) when moving device. Do not move device on unleveled floor. Do not tilt device 15 ° or more. 4) Choose the location to place device where the slope is less than 15 °. (Only left and right direction from view of operator’s side.
2) Remove the two Upper Packing, Outside Packing. 3) Remove the High Capacity Hopper.
2.4 Unpacking of the Container Stacker 1 or 2 WARNING 1) Be careful when unpacking using the crane or forklift. Do not to drop device, hit it against something, or turn it over on its side. 2) Perform unpacking where there is no dust or water leaking. 3) Do not place heavy objects which weigh 5 kg or more on device. 4) Be careful when lifting device with the forklift so device is well-balanced on the arms of the lift. Also put the packing (cushion) between device and forklift so device is not damaged.
2.4.3 Unpacking Procedures 1) 2) 3) 4) 5) Remove the V band from the shipping box using a cutter and remove the cap. Remove the accessory box, spacer box, spacer packing, ramp, and upper packing. Remove the shipping box, P.P band and four corner packing. Peeling off the adhesive tapes, remove the plastic bag. Cut the tape for corner on pallet, and push down the side of pallet to outside.
6) Remove the tape for leveling bolt, and take out four wood spacers from accessory box, it puts on the bottom of leveling bolts (under plastic bag), turned the leveling bolt by using the Adjustable Open End Wrench, and raised the Container Stacker. 7) Remove the four base packing. Wood spacer Down Up Leveling bolt 8) Turned the all casters in the same direction. Caster 9) Install the ramp to the bottom of an inclination board. (Ramp is two pieces to both sides).
2.4.4 Parts Check in the Accessory Box Basket (small) Cover Guard (Only Container Stacker2) Screw * Hopper spacer * Joint bracket (L) Wood spacer Guide plate (L) * Partition Joint bracket (U) User’s Guide Guide plate (U) Accessory box Table 2.8 Parts list in the Accessory Box No.
2.5 Unpacking of the Transit Pass Unit Type DDP WARNING 1) Perform unpacking where there is no dust or water leaking. 2) Do not place heavy objects which weight 5 kg or more on device. 3) Observe the speed limit of 300 mm/sec. (1.08 km/hr) when moving device. 4) Choose the location to place device where there is no condensation. 2.5.1 Confirmation of Parts Quantities Table 2.9 Components in the package Unit of Packing Quantity Transit Pass Unit Type DDP 1 2.5.
2.5.3 Unpacking Procedures 1) Open the Shipping box. 2) Remove the Accessories parts and two Upper Packing. 3) Remove the Transit Pass Unit Type DDP. Corner Packing Signal Cable (CS) Corner Packing SB Cover Paper Guide Ground Plate and Screws Block Sponge FC Cover Upper Packing Upper Packing Side Packing Plastic bag Transit Pass Unit Type DDP Sheet Relay Cable x 2 N.
2.6 Unpacking of the Finisher SR5000 WARNING 1) Perform unpacking where there is no dust or water leaking. 2) Do not place heavy objects which weight 5 kg or more on device. 3) Observe the speed limit of 300 mm/sec. (1.08 km/hr) when moving device. 4) Choose the location to place device where there is no condensation. 2.6.1 Confirmation of Parts Quantities Table 2.11 Components in the package Unit of Packing Quantity Finisher SR5000 1 2.6.
Chapter 3. Preparation for Installation 3.1 Preparation for Installation of the Printer 3.1.1 Removing the Protection Tape and Mat from the Engine 1) Remove the Tapes and Mats from the Engine. Mat Tape Tape Mat Tape Mat Tape Tape Hopper Cover 2) Open the Front Cover. 3) Remove the Tapes and TH Packing.
4) Turn the TH handle clockwise to open the TH Unit. 5) Remove the Tapes and Mat. TH handle TH Unit Tape Mat 6) Turn the TH Handle counterclockwise to close the TH Unit. 3.1.2 Set the PS Air Filter for the Engine Rear Cover 1) Take out the PS Air Filter from Accessory Box. 2) Install the PS Air Filter to Engine Rear Cover.
3.1.3 Removing the Protection Tape from 2000 Sheet Hopper. Tape 2000 Sheet Hopper 2000 Sheet Hopper Tape 3.1.
3.2 Preparation for Installation of the Finisher [FS-104H] (No RoHS Compliance Unit) 1) Remove the Protection Tapes from the Finisher. 2) Remove the Shift Tray and Screws from the Finisher.
Unscrew the five screws to remove the Rear cover of the Finisher. 3) Remove two Lock materials attached to the Staple portion. (Loosen the M3 x 6 Screws.
4) Remove three Lock materials from each guide plate. (Loosen the M3 x 6 Screws.) 5) Remove the Lock material from the Staple plate unit. (Loosen the M3 x 6 Screws.
6) Install the Rear MT plate. 7) Install the Connecting Cover (F).
8) Install the Shift Tray to the up-down portion (paper exit side) of Finisher. (Truss screw M4x6: 2) CAUTION When installing the Shift tray, fit the four auxiliary fittings to the guide holes of the Main tray before fixing screws.
[FS-108R] (RoHS Compliance Unit) 1) Unscrew the five screws to remove the Rear cover of the Finisher. 2) Remove three lock materials from each guide plate. 3) Remove two stacker lock materials (right and left).
4) Remove two lock materials inside the stacker (on the side to be joined to the main body). 5) Remove two lock materials inside the stacker (lower).
6) Install the Main tray on the up-down portion (paper exit side) of the Finisher. (Truss screw M4x6: 2) CAUTION When installing the Main tray, fit the four auxiliary fittings to the guide holes of the Main tray before fixing screws.
3.3 Preparation for Installation of the High Capacity Hopper 1) Remove the Protection Tapes from the High Capacity Hopper. 2) Remove the Paper. Tape Tape High Capacity Hopper Tape High Capacity Hopper Paper 3) Remove the Protection Tape and Mirror Mat from the High Capacity Hopper.
4) Confirm the Paper Guide position of the High Capacity Hopper. (LT or A4) Usually, Paper Guide position is set in “LT” at the shipment. When the customer wish to use the High Capacity Hopper in A4 paper, change the Paper Guide position according to the following steps. [Change procedure of the Paper Guide Position] 1. Open the Front door, and remove two M4 Screws. 2. Lift up the Paper Guide and move to the outside. 3. Insert the upper and lower of the Paper Guide to a Guide hole for“A4”.
3.4 Preparation for installation of the Container Stacker 1 or 2 1) Peel off the Protection Tapes and cushion from the Container Stacker 1 or 2. 2) Open the Front Cover L and peel off the Protection Tapes. 3) Peel off the mat under the Basket. Basket Adhesive tape Front cover L Cushion Adhesive tape Adhesive tape Adhesive tape Adhesive tape Adhesive tape Front cover L < Opening procedure of the Front Cover L > 1) Open the front cover R.
4) Take the CP417 P/K(No RoHS Compliance Unit) or CP627 P/K(RoHS Compliance Unit) out of the lower basket.
3.5 Preparation for installation of the Transit Pass Unit Type DDP 1) Remove the Protection Tapes from the Transit Pass Unit Type DDP.
Chapter 4. Installation 4.1 Installation in the composition of the Printer and Finisher / Finisher SR5000 CAUTION Don't install the Printer in any place where it will be subjected to direct sunlight since it may cause adverse effects on performance of the Printer. 1) Releasing the Rear Cover (2) Unscrew the six M4 Screws. (3) Unhook the bottom of the Rear Cover and release the Rear Cover. (Release the Rear Cover by lifting up and pulling forward.
[FS-104H] (No RoHS Compliance Unit) 2) Remove the two M3 x 8 Screws and Static electricity eliminator from Printer. 3) Install the Guide plate/(G) with the Static electricity eliminator by using the two M3 x 8 Screws. 4) Install the Guide plate/(H) Ass’y.
5) Install the Connecting stay and Main MT plate.
[FS-108R] (RoHS Compliance Unit) 6) Install the Joint cover/U, Joint cover/F, and the Joint cover/R. and install the Main Fixed plate/1.
[Finisher SR5000] with Transit Pass Unit Type DDP 7) Install the SB Cover Paper Guide to the Printer.
8) Connecting the Power Supply Cable Please connect the cable according to this procedure when you use cables other than the cable appended to the machine. (1) Put the Power Supply Cable and put it through the Cord Lock and pull it out of the Terminal Block. (2) Connect the Power Supply Cable to the Terminal Block and chassis. (3) Fasten the Power Supply Cable by the Cord Lock. WARNING 1) The voltage is constantly in unless the machine is unplugged or Breaker Switch is turned off.
WARNING 1) Unplug the Power Supply Cable prior to connecting. 2) Be careful not to have other personnel plug in the power cable while performing the connecting. 3) Be sure to use power supply cable which complies with the following specification : Power plug rating ; Min. AC 250V, Min. 15A (2-Pole, 3-Wire, Grounded) 6-15P UL Listed, CSA Certified in North America Type CA, Conformed to IEC 950 in Europe Power cable rating ; Min. AC 250V, Min.
[FS-104H] (No RoHS Compliance Unit) 9) Install the Finisher to the Printer. CAUTION Adjust the gap between Finisher and Printer by turning the adjustment bolt of Finisher. (1) Adjust the gap between Finisher’s paper guide and Printer’s paper guide become 0 to 3mm. (2) Adjust the gap between Finisher and Printer is equal from the top through the bottom.
10) Connect the connectors of Printer with the Finisher. CAUTION 1) When connecting the connectors of printer with the finisher, pass the cable through the Hole of the Printer and clamp the cable with the cable clamp to protect the cable from the flame edge. 2) Switch on No.8 of SW1 of on the print circuit board of the Printer.
11) Install the Connecting Cover(R). 12) Install the Rear cover of Printer and Finisher.
[FS-108R] (RoHS Compliance Unit) 13) Install the Finisher to the Printer. (4) Fit the hooks on the main body installation plates (upper and lower) into the upper and lower holes on the Finisher as illustrated below, then lock them by pushing the Finisher to the back. CAUTION When installing the Finisher, don’t hit following “A” part to the Printer. Confirm the SB cover opens and shuts smoothly after attaching.
CAUTION If the gap between the Finisher and Printer is not equal from the top through the bottom, adjust it by the height of the front and rear casters on the paper exit side of the Finisher. The jack of the printer is adjusted when the SB cover doesn't open and shut smoothly, the printer is lowered, and the SB cover opens and shuts smoothly. A=B A B (5) Fix the Finisher to the Printer (front side only).
14) Connect the connectors of the Printer with the Finisher. (1) When connecting the connectors of printer with the Finisher, pass the two cables through the Hole of the Printer and Finisher. (2) Connect the I/F Cable to the CN7 connector on the Print Circuit Board through the cable clamps with other cables like following figure. (3) Connect the Power Cable to the Relay Connector like following figure. (4) Switch on No.8 of SW1 of on the Print Circuit Board of the Engine. (5) Switch on No.
[Finisher SR5000] with Transit Pass Unit Type DDP 15) Releasing the Rear Cover of the Transit Pass Unit Type DDP. (1) Unscrew the three M4 Screws. (2) Unhook the lower hook of the Rear Cover and release the Rear Cover. (3) (Release the Rear Cover by lifting up and pulling forward.) 16) Install the Block Sponge to the Transit Pass Unit Type DDP. Block Sponge M4x8 Screw Rear Cover Transit Pass Unit Type DDP 17) Open the Front Cover and Lower paper guide.
18) Install the Transit Pass Unit Type DDP to the Printer. NOTE Install it carefully so that Upper Paper Guide and SB Cover Paper Guide do not collide SB Cover Paper Guide Upper Paper Guide M4x8 Screw Projection Transit Pass Unit Type DDP M4x8 Screw Projection (1) Insert the two Projections in the Gap.
CHECK Open and close the SB Cover. When the SB cover does not open, adjust Transit Pass Unit Type DDP to an arrow direction. Lower Paper Guide SB Cover Adjust arrow direction Transit Pass Unit Type DDP (2) Install the Transit Pass Unit Type DDP by using the four M4x8 Screws. (3) Close the Lower paper guide and Front Cover. CHECK Open and close the Lower paper guide. When Lower Paper Guide and SB Cover Paper Guide collide, repair it by hand because SB Cover Paper Guide may transform it.
19) Connect the connector of cables to the Printer and Transit Pass Unit Type DDP. (1) Pass the three cables through the Hole of Printer and Transit Pass Unit Type DDP from Transit Pass Unit Type DDP to Printer. - AC cable (white 2pin connector) x2 - Signal cable (black 20pin (small) / black 14pin connector / black 22pin) - GND cable (2) Pass the one cable through the Hole of Printer and Transit Pass Unit Type DDP from Printer to Transit Pass Unit Type DDP.
CP board CP board connection 3 connection 4,5 J717 J791 J747 CE AC cable L.V.P.
20) Install the Rear Cover of the Printer and Transit Pass Unit Type DDP. M4x8 Screw M4x8 Screw M4x8 Screw Rear Cover of the Printer 21) Install the Ground Plate to the Transit Pass Unit Type DDP.
22) Install the Finisher SR5000 to the Transit Pass Unit Type DDP. (1) Refer to the Installation Procedure of the Finisher SR5000. (2) Install the FC Cover to the front door on the Finisher SR5000.
4.2 Installation in the composition with the High Capacity Hopper 1) Install components other than the High Capacity Hopper. 2) Draw the 2000 Sheet Hopper of the Engine. 3) Remove the two M4 screws and Side Cover.
4) Connecting the two connectors (3pin and 14pin) to the HPxxx Ass’y of the Engine. 5) Connecting the High Capacity Hopper. (1) Put the Positioning Pin in the hole A and slide the High Capacity Hopper in the arrow direction. (2) Make sure that the Cable does not get caught between the Printer and High Capacity Hopper. 6) Tighten the two M4 screws. 7) Return the 2000 Sheet Hopper.
8) Remove the six M4 screws and Rear Cover. 9) Switch on No.6 of SW1 on the CP P/K of the Engine. 10) Install the Rear Cover. M4 Screw 11) Turn the leveling bolt ( 2 Places) to make the bottom of the High Capacity Hopper parallel with the floor, judging by your eyes.
4.3 Installation in the composition with the Container Stacker 1 or 2 4.3.1 Connection of the Engine and Container Stacker 1 or 2 1) Drawer the 2000 Sheets Hopper and set the paper guide at the position of 8.5” paper size. 2) Remove the M4 Screw and the 2000 Sheets Hopper. Paper guide Lever M4 Screw 2000 Sheets Hopper 3) Turn the four leveling bolts until casters are floated. 4) Adjust the horizontal level of the printer with the Level Meter putting on the frame.
5) Install the 2000 Sheets Hopper. M4 Screw 2000 Sheets Hopper 6) Remove the two M3x8 Screws and Electrostatic Eraser from the Engine. 7) Install the Guide plate (U) with the Electrostatic Eraser (“FRONT” letter is surface.) by using the two M3x8 Screws. (Be careful that the hair of the Electrostatic Eraser does not fall.) 8) Install the Guide plate (L) by using the two M3x8 Screws with washer. 9) Install the Joint Bracket (U) and Joint Bracket (L) by using the two M4x8 Screws.
10) Releasing the Rear Cover of the Engine. (1) Unscrew the six M4 Screws. (2) Unhook the lower hook of the Rear Cover and release the Rear Cover. (3) (Release the Rear Cover by lifting up and pulling forward.
12) Attach the Container Stacker to the Engine. (1) Pass the AC Relay cable (2-pin white connector) and FNS IF cable (20-pin black connector) through opening “A” in the Engine, and then through opening “B” in the Container Stacker. (2) Pass the CST FG cable and CST AC cable (2-pin white connector) through opening “B” in the Container Stacker, and then through opening “A” in the engine. (3) Attach the Engine to the Container Stacker (6 M4x12 screws). Important: Do not tighten the screws all the way.
(2) It looks into the space between Printer and Container stacker from a rear side, the height of the Frame’s upper part of Container stacker and the Guide plate U’s upper part is the same. (3) Put the Level Meter on two places of Container stacker is level. Guide plate (U) Frame Connection part details CHECK Check the Gaps of A,B,C,D are nearly equal each other.
CHECK Open the L paper guide A of the Container Stacker make sure that the SB cover can be opened. When not open, re- adjusts to implement the item 4.3.1.12) and to lift the Container Stacker. L paper guide A SB cover 14) Remove the OC P/K ass’y from the printer. Remove the CPXXX P/K and CP P/K holder. 15) Remove the nv-RAM from the CPXXX P/K by using IC gripper.
16) Connect the CST AC cable coming from the Container Stacker to the J236 on the power supply of the printer (Connection 1 on the below figure). At this time, connect CE AC cable that is disconnected from the J236 to the connector of the CST AC cable (Connection 2 on the below figure) 17) Mount the CST FG cable coming from Container Stacker side on the printer frame by using M4 screw (Connection 3 on the below figure).
21) Turn on the No.5 and Turn off the No.2 and 8 of the SW1 mounted on the CPXXX P/K of the Engine. (No RoHS Compliance Unit) 22) Turn on the No.5 and turn off the No.2 and 8 of the SW1 mounted on the CPXXX P/K of the Engine. Turn off the No.7 and 8 of the SW2 mounted on the CPXXX P/K of the Engine. (RoHS Compliance Unit) 23) Install the Rear Cover of the Engine and Container Stacker.
4.3.2 Connection of the Container Stacker 1 and Container Stacker 2 1) Perform item 4.3.1. 2) Remove the two M3x8 Screws and Electrostatic Eraser from the Container stacker 2. 3) Install the Guide plate (U) with the Electrostatic Eraser (“FRONT” letter is surface.) by using the two M3 Screws. (Be careful that the hair of the Electrostatic Eraser does not fall.) 4) Install the Joint Bracket (U) and Joint Bracket (L) by using the two M4x8 Screws.
6) Install the Container Stacker 1 to the Container Stacker 2. The screw is the thing of the temporary stopping. Container stacker 1 M4x12 screws M4x12 screws Container stacker 2 M4x12 screws Frame projection part 7) In order to adjust the height of Container stacker, turn 180 degrees each of four leveling bolts, and satisfy the following conditions, and bolt the screw of a temporary tight.
(2) It looks into the space between the Container stacker 2 and Container stacker 1 from a rear side, the height of the Frame’s upper part of Container stacker 1 and the Guide plate U’s upper part is the same. (3) Put the Level Mater on two places of Container stacker is level. Guide plate (U) Frame Connection part details CHECK Check the Gaps of A,B,C,D are nearly equal each other.
8) Connect the FNS IF cable (4 pin white connector) coming from the Container Stacker 2 to the J680 on the ST09X P/K of the Container Stacker 1. (Connection 1 on the below figure) 9) Take out the CST AC cable (2 pin white connector) from the Container Stacker 1 and connect it to the CST AC cable (2 pin white connector) of the Container Stacker 2.
14) Install the Rear Covers of the Engine, Container Stacker 1 and Container Stacker 2.
4.3.3 Connection of the Container Stacker 2 and Finisher / Finisher SR5000 [FS-104H] (No RoHS Compliance Unit) 1) Remove the two M3 screws and the discharging brush from the Container Stacker 2. 2) Install the Guide plate (G) with the Static electricity eliminator (“FRONT” letter is surface.) by using the two M3 Screws. (Be careful that the hair of the Static electricity eliminator does not fall.) 3) Install the guide plate (H), connecting stay and main MT plate.
5) Install the Standard Finisher to the Container Stacker 2. Container stacker 2 Standard finisher M4 screws M4 screws 0 to 3 mm Finisher paper guide Container stacker 2 paper guide Adjust the gap in parallel. A Adjustment bolt Loosen CHECK Adjust a difference between the paper guide of stacker side and printer side by 0-3 mm. Check the Gaps of A, B, C, D are nearly equal each other. If they are not, re-adjust by adjusting leveling bolts.
6) Connect the FNS IF cable (4 pin white connector) coming from the Container Stacker 2 to the 4 pin white connector in the Finisher (Connection 1 on the below figure). 7) Connect the FNS IF cable (20 pin black connector) coming from the Container Stacker 2 to the CN7 connector on the Finisher main P/K (Connection 2 on the below figure). 8) Turn on the No. 5 and 8 and turn off the No. 2 of the SW1 mounted on the CPXXX P/K of the Engine.
[FS-108R] (RoHS Compliance Unit) 10) Install the Joint Cover /F, Joint Cover /U and Joint Cover /R to the Container Stacker 2, and install the two Main Fixed Plate/1 to the Joint Cover /R. Joint cover / U M4x6 Truss screw 6-M4x6 TP screws Main Fixed Plate/ 1 Joint cover / R Main Fixed Plate/ 1 Joint cover / F Container Stacker 2 11) Remove the rear covers from the Engine, Container Stacker 2 and Finisher.
12) Install the Finisher to the Container Stacker (1) Fit the hooks on the Container Stacker installation plates (upper and lower) into the upper and lower holes on the Finisher as illustrated below, then lock them by pushing the Finisher to the back. CAUTION When installing the Finisher, don’t hit following “A” part to the Printer. Confirm the SB cover opens and shuts smoothly after attaching.
CAUTION If the gap between the Finisher and Container Stacker is not equal from the top through the bottom, adjust it by the height of the front and rear casters on the paper exit side of the Finisher. The jack of the printer is adjusted when the SB cover doesn't open and shut smoothly, the printer is lowered, and the SB cover opens and shuts smoothly. A=B A B (2) Fix the Finisher to the Printer (front side only).
13) Connect the FNS IF cable (4 pin white connector) coming from the Container Stacker 2 to the 4 pin white connector in the Finisher (Connection 1 on the below figure). 14) Connect the FNS IF cable (20 pin black connector) coming from the Container Stacker 2 to the CN7 connector on the Finisher main P/K (Connection 2 on the below figure). 15) Turn on the No. 5 and 8 and turn off the No. 2 of the SW1 mounted on the CPXXX P/K of the Engine. Turn on the No.8 and Turn off the No.
[Finisher SR5000] with Transit Pass Unit Type DDP 17) Install the SB Cover Paper Guide to the Container Stacker.
18) Releasing the Rear Cover of the Transit Pass Unit Type DDP. (1) Unscrew the three M4 Screws. (2) Unhook the lower hook of the Rear Cover and release the Rear Cover. (3) (Release the Rear Cover by lifting up and pulling forward.) 19) Install the Block Sponge to the Transit Pass Unit Type DDP. Block Sponge M4x8 Screw Rear Cover Transit Pass Unit Type DDP 20) Open the Front Cover and Lower paper guide.
21) Install the Transit Pass Unit Type DDP to the Container Stacker. NOTE Install it carefully so that Upper Paper guide and SB Cover Paper Guide do not collide SB Cover Paper Guide Upper Paper Guide M4x8 Screw Projection Transit Pass Unit Type DDP M4x8 Screw Projection (1) Insert the two Projections in the Gap. Container Stacker Cover Container Stacker Cover Gap Projection of Transit Pass Unit Type DDP Gap (2) Install the Transit Pass Unit Type DDP by using the four M4x8 Screws.
(3) Close the Lower paper guide and Front Cover. CHECK Open and close the Lower paper guide. When Lower Paper Guide and SB Cover Paper Guide collide, repair it by hand because SB Cover Paper Guide may transform it.
22) Connect the connector of cables to Container Stacker and Transit Pass Unit Type DDP. (1) Disconnect the Signal Cable from EDxxx PK in the Transit Pass Unit Tyoe DDP. (white 8pin connector and black 22pin connector) (2) Connect the Signal Cable(CS) to EDxxx P/K of the Transit Pass Unit Type DDP. (white 8pin connector and black 22pin connector) (3) Pass the three cables through the Hole of Container Stacker and Transit Pass Unit Type DDP from Transit Pass Unit Type DDP to Container Stacker.
CP board connection 2 disconnection 1 / connection1 connection 4 connection 3 CP board J717 SW2 SW1 J791 J747 Location of connection 2 and DIP SW 01 02 II L 00 Preparation for Installation 4-49 connection 5
23) Install the Rear Cover of the Printer, Container Stacker and Transit Pass Unit Type DDP. M4x8 Screw M4x8 Screw Rear Cover of the Printer M4x8 Screw Rear Cover of the Container Stacker M4x8 Screw 24) Install the Ground Plate to the Transit Pass Unit Type DDP.
25) Install the Finisher SR5000 to the Transit Pass Unit Type DDP. (1) Refer to the Installation Procedure of the Finisher SR5000. (2) Install the FC Cover to the front door on the Finisher SR5000.
Chapter 5. Checks 5.1 Confirmation of the paper size indication 1) Adjust the size guide of tray 1 to the A4 size or the Letter size. Size Guide 2) Adjust the sensor plate of tray 1 to A4 or LTR. Sensor Plate 3) Place the A4 size paper or the Letter size paper into the tray 1.
4) Adjust the size guide of tray 2 and tray 3 to the A4 size or the Letter size Size Guide 5) Adjust the sensor plate of tray 2 and tray 3 to A4 or LTR. Sensor Plate 6) Place the A4 size paper or the Letter size paper into the tray 2 and the tray 3.
7) Push the [information] switch in the main menu screen. [Main Menu] Information 8) Push the [Printer] switch in the information menu screen. [Information Menu] Printer 9) Confirm that the paper size of the tray 1,2,3 is the A4 size or the Letter size in the information printer screen. 10) Push button twice, and return to the main menu screen.
5.2 Printing of the status reports 1) Push the [Reports] switch in the main menu screen. [Main Menu] Reports 2) Push the [Status] switch in the reports menu screen. [Reports Menu] Status 3) It is returned automatically to the main menu, and the Status page is printed.
5.3 Check the print contamination 1) Push the [Printer] switch in the main menu screen. [Main Menu] Printer 2) Push the [Test Print] switch in the printer menu screen. [Printer Menu] Test Print 3) The way of test printing is as follows. Printer / Test Print / Print Quality / Text File 4% / Tray * / Elevator Tray / Color Duplex / 1 (Copies) * Input either tray 4) Confirm that there is no printing contamination when sampling print samples.
5.5 Adjustment of paper feeding position of Tray 1 When Container Stacker 1 or Container Stacker 2 was installed. This adjustment is applied to DDP70 and DDP92. When container stacker 1 and container stacker 2 are installed, confirm paper feeding position in container stacker 2. 1)Print the same sized paper from tray 1 and tray 2, and check the paper feeding position. 2)In case that the configuration includes Container Stacker 1, check the paper feeding position on the sample tray.
Top Cover Container Stacker 2 Interlock switch Measurement position (slit between paper guides) (20) 15 100 (20) (20) 100 Hopper Spacer Hopper Spacer II L 00 Installation 5-7
8) If printed-paper have “dog-eared corners”, check the next item. Because paper may touch a tip of entrance paper guide. (1) Check which of “Disable”, “Enable” and “Auto select” the de-curler function of the container stacker selects in OCP. (2) Install the container stacker slightly than the printer above. Check the mark position of front side and the mark frame of rear side, and adjust the leveling bolt.
Appendix 1.Installation Area Information CAUTION * Don't install the Server in the following place. The position in which the Cover and the Tray cannot be opened. Under the tray of the Finisher. Front of exhaust fan. Top of the Printer. Appendix 1.1 Installation/maintenance area of the Printer and Finisher.
Appendix 1.2 Installation/maintenance area of the Printer, High Capacity Hopper and Finisher.
Installation/maintenance area of the Printer and Container Stacker 1 (including sample tray). (Unit : mm) Appendix 1.
Installation/maintenance area of the Printer, High Capacity Hopper and Container Stacker 1 (including sample tray). 700 3270 Appendix 1.
Installation/maintenance area of the Printer, Container Stacker 1 (including sample tray) and Container stacker 2 (including through path unit). 700 3886 700 665 II L 00 Appendix 5 1200 (Unit : mm) Appendix 1.
Installation/maintenance area of the Printer, High Capacity Hopper, Container Stacker 1 (including sample tray) and Container stacker 2 (including through path unit). (Unit : mm) Appendix 1.
Appendix 1.7 Installation/maintenance area of the Printer, Container Stacker 2 (including through path unit) and Finisher.
Installation/maintenance area of the Printer, High Capacity Hopper, Container Stacker 2 (including through path unit) and Finisher. (Unit : mm) Appendix 1.
Installation/maintenance area of the Printer, Transit Pass Unit Type DDP and Finisher SR5000. Printer Transit Pass Unit Type DDP Operator Side 1215 Finisher SR5000 2804 (889) 700 Appendix 1.
Printer Operator Side Finisher SR5000 Transit Pass Unit Type DDP (889) 1215 3104 1000 High Capacity Hopper Appendix 1.10 Installation/maintenance area of the Printer, High Capacity Hopper, Transit Pass Unit Type DDP and Finisher SR5000.
Printer Container Stacker 2 Operator Side Finisher SR5000 Transit Pass Unit Type DDP (1157) 1215 3722 (650) 700 Appendix 1.11 Installation/maintenance area of the Printer, Container Stacker 2 (including through path), Transit Pass Unit Type DDP and Finisher SR5000.
Printer Container Stacker 2 Operator Side Finisher SR5000 Transit Pass Unit Type DDP (1157) 1215 4022 (650) 1000 High Capacity Hopper Appendix 1.12 Installation/maintenance area of the Printer, High Capacity Hopper, Container Stacker 2 (including through path), Transit Pass Unit Type DDP and Finisher SR5000.
Appendix 2. Locations of the Leveling Bolt and Caster Appendix 2.1 Locations of the Leveling Bolt and Caster of the Printer CAUTION Make sure that the ground under the floor where the Leveling Bolt is installed is reinforced by the stand or other. If the ground is not reinforced, because of the holes on the floor, the Printer may tilt and maybe the paper path will be affected. Caster Circling Dia. Leveling Bolt Dia.
Appendix 2.2 Locations of the Leveling Bolt and Caster of the Finisher Finisher Appendix 2.
Appendix 2.4 Locations of the Leveling Bolt and Caster of the Container Stacker.