Service manual

4. Move the 1st and 2nd scanners [A] to the left so that you can
access under the left scale bracket [B].
5. Install the optics anti-condensation heater [C] on the optics
bottom plate as shown with 2 screws.
6. Pass the heater connector [D] through the heater harness access
hole and connect it with the ac harness connector [E] (2P red) as
shown.
7. Reassemble the copier.
8. Tell the customer that the copier main switch should be turned off
and the power cord should not be unplugged at night. Otherwise.
the optics anti-condensation heater will not function.
[C]
[B]
[E]
[D]
[A]
FT5733/5433 3-26 FSM