Specifications

New York State Office of General Services
Solicitation Number 1767 Integrated Facility Management
Page 14 of 54
responsible for the Property Manager(s) performance. Indicate corporate representative‘s
availability to OGS if needed to resolve issues. Information to be provided regarding the
Property Manager and his/her supervisor is to include:
a. Contact information, complete resume
b. Length of career in providing Building Management Services;
c. Professional designations;
d. Number and size of buildings managed in the last three years.
The name of the person or persons designated as the ―Chief Building Engineer that will be
responsible for the overall management and supervision of all building mechanical and
electrical systems, for each building or buildings.
Information to be provided regarding the Chief Building Engineer and his/her supervisor is to
include:
a. Contact information, complete resume
b. Length of career in providing Building Engineering Services;
c. Professional designations;
d. Number and size of buildings managed in the last three years.
OGS retains the right to request additional information from Proposers, pertaining to the Proposer‘s
ability, qualifications, and procedures proposed to accomplish all work specified under this solicitation.
2.2.9 General Procurement Forms
Documents From Appendix B General Procurement Forms
Contractor information
Procurement Lobbying Forms
Taxation & Finance Contractor Certification
MacBride Principles
Non/Collusive Bidding Certificate
2.2.10 Cost Proposal
Bidder must submit a completed Appendix D Cost Proposal Form
Bidder must complete each section of the cost proposal as provided. Any additions, incompletions,
altering qualifiers, assumptions or clarifications to the cost proposal form will result in rejection (also see
section 2.3 Packaging of RFP Response and 3.4 Price
2.3 Instructions for Packaging of RFP Response
Bidders must separate the Cost Proposal Form (Appendix D) from all other documents and submit these
as two separate packages.
If bidders intend to bid both lots, then a total of 4 packages must be submitted.
For each LOT, please submit: