3. The Contractor will use reasonable care to minimize the generation of waste, and will properly
dispose of all waste it does generate. The Contractor must follow environmentally safe practices
when disposing of any waste.
4. The Contractor will use reasonable care to minimize risk its work poses to the environment, the
customers, the general public and the contract employees.
5. The Contractor shall immediately notify the Facility Manager in writing of any indication of
underground oil seepage which may be attributed to Contractor’s work.
3.13 Contractor Close-Out Inspection (If Required)
Sixty (60) days prior to the expiration of the contract, the Contractor and the Facility Manager, or
designee, will make a complete examination of the building system/equipment covered under the
contract. The Contractor shall coordinate and schedule the examination with the Facility Manager. The
Facility Manager shall determine if such an examination is warranted. The Facility Manager or designee
will prepare an Existing Deficiency Report listing all deficiencies noted during the examination. The
Contractor shall correct all deficiencies, as required by this contract, prior to the expiration of the.