Installation Guide
Openpath Access Control System Installation Guide
GETTING STARTED
ADDITIONAL RESOURCES
PRIOR TO INSTALLATION
Installation
NETWORK REQUIREMENTS
SELECTING A BACKUP BATTERY
MOUNTING INSTRUCTIONS
RECOMMENDED CONFIGURATION
WIRING WITH THE 12/24V POWER SUPPLY
WIRING THE REX WITH THE DOOR STRIKE
WIRING THE REX WITH THE ELECTROMAGNETIC LOCK
WIRING FAIL SAFE AND FAIL SECURE LOCKING HARDWARE
WIRING TO LEGACY PANELS
WIRING THE OPENPATH ELEVATOR BOARD
Troubleshooting
LEGACY WIRING
ACU LEDS
READER LEDS
RESETTING THE ACU
PROVISIONING THE ACU
Regulatory
UL
CAN/ULC 60831-11-1-16 GRADE 1
FCC
IEC 62368-1
Warnings
Version 1.5
©
Openpath 2019
Page 2