Quick Start Guide

RIGOL
Quick Guide for DG5000
21
5. Install the Front Panel: aiming the instrument front panel at the opening of the
Front Panel of the machine rack and fix them with four M4 screws.
6. Load into the machine cabinet: mount the rack fixed with instrument into a
standard 19-inch machine cabinet with four M6 screws and square nuts.
7. Post-installation notice: The rack occupies a height of 3U. The holes pointed out
by the arrows are the installation holes. Note that they are aligned while
installing.