1. Remove all packing and hardware from
inside of the unit by removing the outer
lter and inner lters.
2. The air ltration unit can be hung from
the ceiling. Hang the unit using four
eye bolts (A, Fig.01), and four joist
hooks (B, Fig.01) provided. Unit can
also sit on a bench by installing rubber
feet provided.
Fig.01
Assembly
!
!
WARNING
Mounts must be anchored to building
structure, which will support a minimum of
at least 100 pounds. Never mount to
surfaces such as dry wall or false ceiling
grids, etc.
Air Filtration Unit Placement:
The ideal location for an air ltration unit is centered in the shop ceiling mounted
approximately 7-8 feet in the air. Another good location is above an area where a
lot of sanding is done. Example, if you do lathe work, sand the workpiece in place
and have a sanding center nearby, hang the air ltration unit between both areas.
If hanging the unit is not an option it can be mounted on a bench. Again, near an
area that produces the most dust. Remove the four corner screws at the bottom
of the air itration unit and install the rubber feet.
Depending on shop size you may need more than one air itration unit, or may
have to choose a larger size. If you have questions regarding placement of the
air itration unit you can contact Tech Support at 1-877-884-5167 or by email at
techsupport@rikontools.com.