Operating instructions

• Do not touch hot water connections or the flue outlet when the boiler is operating.
Installation procedure
Place the boiler body on a non - flammable materials.
Install a temperature safety valve. Watch for the arrow indicating the water flow direction. It must be as
shown in fig 10.
After connecting the boiler to the heating system, screw filling and drain stopcocks into the back section.
Screw the flue adapter with smoke flap onto the boiler combustion gases outlet.
Put a flue over the flue adapter and insert it into the chimney connection hole. The flue diameter is 150 mm
Install a thermo-mechanical output regulator into the opening in the top part of the front section.
We recommend fitting shutting valves on the hot water inlet and outlet, without which it would be necessary
to drain the entire heating system before the filter can be cleaned.
No shutting valve may be installed between the boiler and the expansion vessel.