Operating instructions
•
Applicable regulations and standards ;
•
Sound installation and operation procedures
•
Conditions stated in the Warranty Certificate and the Service Book
•
Conditions
stated
in
the
Warranty
Certificate
and
the
Service
Book
.
Situations might occur in practice, when the following essential precautions must be taken:
•
Shut the boiler down every time when there are any ( even temporary ) flammable or explosive fumes
present on the premises from which combustion air is supplied to the boiler ( e.g. from paint when painting,
laying and spraying molten substances, from gas leakage, etc.) ;
•
if it is necessary to drain water from the boiler or from the whole system, the water must not be
dangerously hot;
•
If there is any leakage from the boiler’s heat exchanger, or when the exchanger is clogged up with ice, do
not attempt to start up the boiler until normal operating conditions have been restored;
Ensuring safety of equipment and people
•
The boiler ( and all accessories ) complies with the requirements of EN 303 – 5 its updates and all relevant
European standarts.
•
In order to run and operate the boiler in accordance with the purpose for which it is designed in actual
conditions of use (hereafter referred to only as use), it is necessary to abide also by additional requirements
the most essential ones of which (i.e.those which must not be omitted ) are found in the related regulatory
dt
documents.
•
In addition to the above mentioned documents, it is necessary when using the boiler to proceed in accor-
dance with this Operation and Installation guide and the accompanying boiler manufacturer's documentation.
•
Any interference by children, persons under the influence of narcotic drugs, certified persons, etc., when
using the boiler, must be prevented.
Head Loses
fig.04
6