Installation Sheet

Rinnai Tankless Water Heater Installaon and Operaon Manual 55
3.14 Post-Water Heater Installaon Checklist
Complete the following checklist when water heater installaon is complete. You should be able to answer YES to each
queson. If you answer NO to any queson, installaon is not complete. Refer to the applicable secon in the Rinnai
Tankless Water Heater Installaon and Operaon Manual for addional informaon.
For assistance, contact your local dealer or distributor, or call Rinnai Customer Care at 1-800-621-9419.
Reference the Rinnai Tankless Water Heater Installaon and Operaon Manual For
Addional Informaon on the Items Below
INSTALLATION LOCATION YES NO
Have you veried the unit, vent and air intakes meet the clearance requirements?
COMBUSTION AIR & VENTING YES NO
Have all corrosive compounds been removed from around the combuson air inlet of the tankless water
heater?
Have you followed the combuson air requirements to provide sucient combuson air for the tankless
water heater?
Are the correct venng products for the installed model being ulized?
Have you installed the vent screen(s) for PVC vent applicaons?
Have you veried the vent system does not exceed maximum length?
PLUMBING YES NO
Have the water lines been purged of all debris and the lter cleaned?
Have you veried the hot and cold water lines to the tankless water heater are not interchanged?
Does the water supply to the heater have adequate pressure? Is it free of chemicals? Did you verify it does
not exceed total hardness that will damage the heat exchanger?
Have you veried that no toxic chemicals were introduced to the potable water?
Did you drain the tankless water heater if not intended to be used immediately?
Have water quality issues (if any) been addressed?
Have you performed the leak and pressure test for the tankless water heater and plumbing system?
ISOLATION VALVES YES NO
Are the isolaon valves (included with the tankless water heater) installed?
1
2
3
4
3.13 Service Indicator (Service Soon, 55)
This water heater includes a service indicator (Service Soon, SS). When
selected in the parameter sengs, an SS code will display on the controller
indicang that it is me to ush and service the water heater.
Selecon is installers preference based on water condions or other
factors that may inuence the suggested interval of service.
See the parameter sengs secon of this manual for selectable service
intervals.
If Service Soon (55) appears on the controller displayed contact you local
service provider to ush and service the water heater. (see 5.3 Flushing
the Heat Exchanger)
Service Soon will appear again when the me reach to the interval by
seng from reset.
5 TIMES
55
To reset Service Soon(55)
Press the ON/OFF buon 5 mes
NOTE: Service Soon (55) will display on the
controller again when the water heater
reaches the interval selected in the
parameter sengs.