Installation Manual
30         Canadian Air Handler Installation and Operation 
Cold Water 
 Supply Line 
Hot Water Outlets 
Thermostat 
Thermostatic  
Mixing Valve 
Rinnai Canadian Air 
Handler 
1.  Plumb the water out/supply of the Rinnai 
tankless water heater or boiler to the inlet (top 
connection) of the air handler.  
2.  Plumb the air handler water outlet (bottom 
connection) to the water inlet/return of the 
Rinnai tankless water heater or boiler. 
•  Refer to section “4.8  Plumbing Requirements” for complete plumbing requirements.  
•  For standard installations, refer to the piping diagrams in sections 5.7.1 and 5.7.2.  
•  For more information on the tankless water heater or boiler plumbing connections, refer to 
the unit’s Installation and Operation Manual.  
•  Water connections to the air handler should follow all state and local plumbing codes.  
This is not an engineering drawing; it is 
intended only as a guide and not as a 
replacement for professional engineering 
project drawings. This drawing is not intended 
to describe a complete system. It is up to the 
contractor or engineer to determine the 
necessary components and configuration of 
the particular system to be installed. The 
drawing does not imply compliance with local 
building code requirements. It is the 
responsibility of the contractor or engineer to 
ensure the installation is in accordance with all 
local building codes. Confer with local building 
officials before installation.  
Water Inlet  
Cold Water From Air 
Handler Returning to 
Water Heater/Boiler 
Hot Water From 
Water Heater/
Boiler into Air 
Handler 
Water Outlet  
            IMPORTANT 
See page 31 for Legend 
Condensation Drain Line as 
Appropriate 
Recommended Rinnai 
Domestic Priority Switch 
Gas Supply Line 