Install Instructions

Installation & Servicing Instructions Rinnai E-Series
16
Boiler basic piping g. 5
Optional LWCO
T
P
T
hermostat
Bypass for system
ushing only
Back ow
preventer
Ball valve
Manual Fill
Valve
Pressure
gauge
P
Automatic Fill
Valve
Purge Station
Air
Separator
Dirt
Trap
5
6.1 Central heating system
Connect the central heating system according to its instructions.
The boiler pipes can be connected to the installation by means of compression ttings.
Reducers should be used for connecting to thick-walled pipe (welded or threaded).
When removing the plastic sealing caps from the pipes, dirty testing water may
drain from the boiler.
The boiler, when used in connection with a refrigeration system, must be
installed so the chilled medium is piped in parallel with the boiler with appropriate
valves to prevent the chilled medium from entering the boiler.
The boiler piping system of a hot water boiler connected to heating coils located
in air handling units where they may be exposed to refrigerated air circulation
must be equipped with ow control valves or other automatic means to prevent
gravity circulation of the boiler water during the cooling cycle.
Some installations with multiple zone valves may require a differential bypass,
this will prevent excessively high ow rates through a single zone when the
other zone valves are closed.
NOTICE
i
NOTICE
i
NOTICE
i
NOTICE
i