Install Instructions

Installation & Servicing Instructions Rinnai E-Series
9
4 Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
Please check if the packaging is intact.
Check if all the items listed are included in the delivery.
The supply kit contents:
!
CAUTION
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Part No. Description Amoun
t
E50C
Install Parts Bag E50C:
804000088
Boiler with:
44839200
ARV1215U Outdoor reset sensor ARV12 1
44215900 Compression ring Ø22 brass 4
44237500 Compression ring Ø15 brass 4
44357010 Screw 4,8X16mm 4
44380900 Line voltage input connector 3 pole grey 1
44457400 Nut W1.1/8x1/14 22 Compression fitting 2
44527600 Cap de-aerator 1
44748300 Flow restriction MR01 FG 7,6L white 1
44765910 Adapter fitting 15mm x 3/4"NPT ext. 2
44786700 Water lock 1/2"NPT x 1/4"NPT 1
44786800 T/P Gauge 1/4"NPT 1
44786900 Safety valve 3/4"NPT 1
44840100 Adapter fitting 22mm x 1"NPT ext. 2
71035700 Nut 15mm compression fitting 2
Wall mounting suspension bracket 1
8U51650x Installation & Service Instructions 1
8U52650x User information manual 1
8U304000 Warranty document 1
8U300600 ICSL book 1