Install Instructions
Installation & Servicing Instructions Rinnai E-Series
9
4 Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
• Please check if the packaging is intact.
• Check if all the items listed are included in the delivery.
The supply kit contents:
!
CAUTION
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
• Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Part No. Description Amoun
t
E50C
Install Parts Bag E50C:
804000088
Boiler with:
44839200
ARV1215U Outdoor reset sensor ARV12 1
44215900 Compression ring Ø22 brass 4
44237500 Compression ring Ø15 brass 4
44357010 Screw 4,8X16mm 4
44380900 Line voltage input connector 3 pole grey 1
44457400 Nut W1.1/8x1/14 22 Compression fitting 2
44527600 Cap de-aerator 1
44748300 Flow restriction MR01 FG 7,6L white 1
44765910 Adapter fitting 15mm x 3/4"NPT ext. 2
44786700 Water lock 1/2"NPT x 1/4"NPT 1
44786800 T/P Gauge 1/4"NPT 1
44786900 Safety valve 3/4"NPT 1
44840100 Adapter fitting 22mm x 1"NPT ext. 2
71035700 Nut 15mm compression fitting 2
Wall mounting suspension bracket 1
8U51650x Installation & Service Instructions 1
8U52650x User information manual 1
8U304000 Warranty document 1
8U300600 ICSL book 1