Installation Sheet

Installation & Servicing Instructions Rinnai E-Series
21
Natural gas: resume with chapter 6.4.1
When propane gas is desired, the boiler can be converted to propane gas by means
of a conversion kit. Rinnai Part number:
E60SR: 803000016
E85SR: 803000018
E110SR: 803000020
Propane gas: resume with chapter 6.4.2
When natural gas is desired, the boiler can be converted to natural gas by means of
a conversion kit. Rinnai Part number:
E60SR: 803000017
E85SR: 803000018
E110SR: 803000021.
6.4.1 Gas connection with natural gas
The gas supply connection must comply with local regulations or, if such
regulations do not exist, with the National Fuel Gas Code, ANSI Z 223.1.
Pipe sizing for natural gas
Contact gas supplier to size the gas supply line and meter.
Gas piping
A sediment trap must be installed upstream of the boiler.
Theboilergaspipeisequippedwithexternal3/4"M-NPTthread.Useappropriate
sealing.
The connection to the boiler must include a suitable method of disconnection and a gas
control valve must be installed adjacent to the boiler for isolation purposes. The nominal
inletgaspressuremeasuredattheboilershouldbe7"W.C.(18mbar)forNaturalgas
(GasA).Maximumpressurewithnoow(lockup)orwiththeboilerrunningis10.5
inchesW.C.Minimumpressurewiththegasowing(verifyduringboilerstartup)is
4.0 inches W.C.
The gas pipe must be properly supported and connected to the boiler.
Make sure that the gas pipe system does not contain dirt, particularly with new
pipes.
Always check the safety of the gas pipe system by means of a bubble test using
leak-search spray.
The boiler must be isolated from the gas supply piping system by closing its
individual manual shuto󰀨 valve during any pressure testing of the gas supply
piping system at test pressures equal to or greater than 1/2 PSI (3.5 kPa).
NOTICE
i
NOTICE
i
NOTICE
i
Sediment trap gure 10