Installation manual

12
INSTALLATION BOILER
The boiler must be installed to the requirements of the Installation Manual supplied
with the boiler. These instructions do not supersede those instructions, but are to be
followed in conjunction with that manual.
1. Siting the boiler.
The boiler is supplied with a bracket which can be located on the predrilled
backplate. The necessary clearance between the boiler and water heater flues is
achieved with the backplate used in a left hand or right hand configuration. Once the
bracket is secured the boiler can mount directly on to it.
2. Temperature Control.
The boiler operating temperature is to be set in the boiler controller. This is detailed
in the boiler manual.
Room Temperature control is through the wireless programmable room thermostat
that is supplied with the system. The receiver is plugged into the control box behind
the backplate and the stat is located in the required room. Directions on using the
room stat are supplied.
Wireless programmable room stat.