User Guide
Installation & Servicing Instructions Rinnai E-Series
9
4 Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
• Please check if the packaging is intact.
• Check if all the items listed are included in the delivery.
The supply kit contents:
Description Amount
E60SRN
E60SRP
E85SRN
E85CRP
E110SRN
E110SRP
Part No. Fitting Kit complete: 803000022
Boiler with:
Outdoor reset sensor 1 1 1
22mm compression fi tting ring 4 4 4
Nut W1.1/8x1/14 22 Compression fi tting 2 2 2
Adapter fi tting 22mm x 1"NPT ext. 2 2 2
Screw 4,8X16mm 4 4 4
Line voltage input connector 3 pole grey 1 1 1
Cap de-aerator 1 1 1
Water lock 1/2"NPT ext.x1/4"NPT int. 1 1 1
Mano-/thermometer 1/4"NPT 64 1 1 1
Safety valve 4 bar 3/4"NPT ext. 1 1 1
Feed through + plug fl ue gas 1 1 1
Flue adapter Ø80/Ø3" pps UL appr. 1 1 1
Air supply adapter Ø80/Ø3" pps UL appr. 1 1 1
Lip-ring fl ue pipe ø80 1 1 1
Wall mounting bracket HEX1/2S 1 1 1
Template 1 1 1
Installation & Service Instructions 1 1 1
User information manual 1 1 1
Warranty document 1 1 1
ICSL book 1 1 1
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When transporting the boiler must be secured on the transportation equipment to
prevent it from falling off .
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
• Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
!
CAUTION










