Specifications

6
Electrical connection
The 2-strand data bus cable is connected
to terminals A and B of the 2-pole terminal
strip on the bottom plate.
Socket (unit removed)
Important!
The connections are not interchangeable
and must be installed in the socket in
compliance with the identification A and B.
Once the electrical connection is
completed, the room control unit is hooked
in flush at the top of the wall mounting
base and folded down until the locking lug
audibly clicks into the wall mounting base.
Electrical connection at
boiler
The electrical connection depends on the
type and version of the respective heating
generator and takes place directly at the
terminals A and B in the corresponding
boiler control or interface.
Further detailed information can be found
in the documentation for the
corresponding boiler.
A B