Use and Care Manual

Fan Convector Manual 7
GasConnecon
1. Aach 2 xing plates to the boom of the base
plate before connecng the gas.
2. The gas supply line must be gas ght, sized and
installed so as to provide a supply of a gas
sucient to meet the maximum demand of the
heater without loss of pressure.
3. The supplied shut o valve must be installed in
the upstream of the gas line to permit servicing.
4. Flexible pipe and any appliance connector valve
used for gas piping must be types approved by
naonally recognized agencies.
5. Any compound used on the threaded joint of the
gas piping must be a type which resists the acon
of propane gas.
6. Check the gas supply pressure immediately
upstream at a locaon provided by the gas
company. Supplied gas pressure must be within
the limits shown in the specicaons secon.
InstallaonLocaon(connued)
7. Aer compleon of gas pipe connecons, all
joints including the heater must be checked for
gas ghtness by means of leak detector soluon,
soap and water, or an equivalent nonammable
soluon, as applicable. (Since some leak test
soluons, including soap and water, may cause
corrosion or stress cracking, the piping must be
rinsed with water aer tesng, unless it has been
determined that the leak test soluon is
noncorrosive.)
8. Aer compleng pipework, secure the heater to
the oor. Use the 2 screws provided, as shown in
the drawing. To avoid deforming the oor plate,
do not over torque the screws.