Conversion Manual

Rinnai I-Series Boiler Conversion Manual 9
6. Canadian High Altude Installaon Seng Procedure
All sengs/adjustments must be performed by a qualied Service Technician. The conversion shall be carried
out by a manufacturers authorized representave, in accordance with the requirements of the manufacturer,
provincial or territorial authories having jurisdicon and in accordance with the requirements of the
CAN/CGA-B149.1 or CAN/CGA-B149.2 Installaon Codes.
Canadian High Altude Installaons: Elevaons between 2,000  and 4,500  (600 m and 1,350 m) must
complete the High Altude Label. Place the completed High Altude Label on the controller supporng frame, to
the le side of the rang plate.
5. Conversion Rang Plate
2. Ax the conversion rang plate label on top of the exisng rate plate. DO NOT cover up the cercaon
logos on the exisng rang plate.
1. Enter the required informaon on the conversion rang plate label (shown below):
Place new rang plate label on
top of exisng rang plate.
DO NOT place label over
cercaon logos.
i150S