Rinnai I-Series Condensing Boiler Solo Manual
SATISFACTORY
Front View
Blue Flame
Flame
Rod
UNSATISFACTORY
Front View
Yellow or Green Flame
Flame
Rod
Figure 4
3. Reinstall the boiler front panel using the four screws to secure it.
1. Check the normal operang sequence:
a. When you press the ON/OFF buon, the LED display will illuminate, the combuson fan
will begin to run if water is owing, and the spark will ignite the main burner.
b. This boiler has an automac ignion system. When the main burner has lit, the “In Use”
lamp will glow red and the spark will stop.
2. Visual inspecon of ame:
a. Check that the burner ames are operang normally. The ame can be seen through the
circular window above the burner. When operang normally, the burner ame should
burn evenly over the enre surface. The ame should be clear, blue, and stable. A yellow
ame is abnormal and maintenance is required (Figure 4).