I Series Solo Installation Manual
36
Rinnai I-Series Condensing Boiler Solo Manual
Twin Pipe Vercal Terminaon
of Mulple Boilers
12 in. (0.30 m) minimum
12 in. (0.30 m)
minimum
above
combuson
air opening
Roof
12 in. (0.30 m) above
grade or ancipated
snow level
12 in. (0.30 m)
minimum
Combuson
Air
Exhaust
Vent Sizes:
2 in. PVC
2 in. (60 mm) PP
3 in. PVC
3 in. (80 mm) PP
Vent Lengths: 65 (20 m) 150 (46 m)
45° elbow is equivalent to 3 (1 m)
90° elbow is equivalent to 6 (2 m)
ACCEPTABLE ACCEPTABLE NOT ACCEPTABLE
90° Elbows,
Long Sweep
90° Elbows,
Short Sweep
90° Elbows,
Close Turn
Vent length includes the addional venng, ngs
and terminaons.
Tee Sidewall
12”
4”
Combuson Air
Intake
Exhaust
8”
Horizontal Vent and
Combuson Air Piping
Intake vent installaon not
permied in shaded area.
60 in.
9 in.
8 in.
Ground
12”
36 in. minimum
clearance from intake
to grade, ground, or
ancipated snow level.
X
X
X
X
X X
V
X
X
V = Exhaust Vent
X = Air Inlet
60 in.