4. On the PC Board, press and hold the red buon for ve seconds
1. Remove the boilers front panel by removing the four screws that secure the panel.
2. Locate the PC Board (lower le side of unit). Locate the DIP switches on the PC Board (see below).
3. Adjust DIP switch 8 to the ON posion.
DIP Switches
PC Board
ON
The instrucons in this secon explain how to adjust boiler sengs to
allow for higher exhaust temperatures. These instrucons apply only for
installaons using CPVC, listed Polypropylene, or stainless steel venng. If these instrucons are
not followed exactly, a re or carbon monoxide leak may result causing property damage,
personal injury, or death.
DO NOT adjust boiler sengs to allow higher exhaust temperatures when venng with PVC.
WARNING
Press and Hold
Red Buon
for Five Seconds
This product is equipped with safety devices to control the exhaust temperature which allows for a
variety of venng materials to be used in its nal installaon. The boiler is set up from the factory to
be installed with a PVC venng system and a built-in control to limit the exhaust temperature to be
below 149°F (65°C). In high temperature applicaons where the exhaust temperature can exceed
149°F (65°C), CPVC, listed Polypropylene (PP), or stainless steel venng must be used. The choice of
venng materials may have an impact on overall performance. Also, If the vent material is other than
PVC (CPVC, listed PP or stainless steel) follow the procedure below to adjust the internal sengs.