Installation Manual

58 Rinnai I-Series Condensing Boiler Solo Manual
Do not plumb the condensate drain
with the pressure relief valve; both
must be plumbed independently to
drain.
All condensate must drain and be
disposed of according to local codes.
Use only corrosion resistant materials
for the condensate drain lines such as
PVC pipe or plasc hose.
The condensate drain pipe (along its
enre length) must be at least 1/2 in.
Condensaon drain lines installed in
areas that are subject to freezing
temperatures should be wrapped with
an approved supplemental heat
source. Install per manufacturers
instrucons.
Slope the condensate drain lines
toward the inside oor drain or
condensate pump.
The end of the condensate drain pipe
should be open to the atmosphere.
The end should not be under water or
other substances.
If the condensate drain pipe is closed or
stuck, the drain water will come out from
the side hole on the condensate drain pipe
connecon.
If a oor drain is not available or the drain is
above the level of the condensate drain, a
condensate pump should be installed.
A condensate neutralizer kit is available
from Rinnai. The kit allows condensate to
ow through neutralizing media that raises
the pH of the condensate to a level that will
help prevent corrosion of the drain and
public sewer system. Refer to secon 3.6
Accessoriesfor more informaon.
The condensate drain pipe should be as
short as possible and have a downward
pitch.
Before operaon of the boiler, the
condensate collector must be lled with
water.
CORRECT
Pipe open to
atmosphere
Pipe submerged
in water
NOT
CORRECT
Water level
Refer to neutralizer Installaon Manual
and local codes for neutralizer installaon
guidelines.
Image is for reference purposes only.
EXTERNAL TRAP
NOT REQUIRED
DO NOT
DO NOT connect the condensate drain
line with an air condioning
evaporator coil drain.
Boilers have an integrated condensate
trap. DO NOT install an external
condensate trap.
Pipe open to
atmosphere
Neutralizer