Installation Manual

Rinnai I-Series Condensing Boiler Solo Manual 73
GAS SUPPLY YES NO
Did you verify the gas system is appropriately sized?
Did you verify the boiler is rated for the gas type supplied?
Have you performed a gas line and connecon leak test?
Did you install a manual gas control valve in the gas line to the boiler?
Is the inlet gas pressure within limits?
Did you purge the gas line of any debris before connecng the boiler?
PRESSURE RELIEF VALVE (PRV)
YES NO
Does the PRV comply with the standard for Relief Valves and Automac Gas Shuto Devices for Hot
Water Supply Systems ANSI Z21.22, and/or the standard Temperature, Pressure, Temperature and
Pressure Relief Valves and Vacuum Relief Valves, CAN1-4.4?
Did you verify the heang system PRV is rated to 30 PSI?
Is the discharge from the PRV piped to the ground or into a drain system as per local codes?
Is the discharge line from the PRV pitched downward and does it terminate 6 in. (152 mm) above the
drains?
Is the discharge end of the line plain (unthreaded) and a minimum of 3/4 in. diameter?
Is the discharge line material suitable for at least 180° F water?
Did you take measures to protect the PRV and PRV discharge line from freezing?
Have you veried the PRV is not plumbed with the condensate drain line?
Have you veried the PRV is not plugged and that reducing ngs, valves, or other restricons are not
installed in the relief line?
POWER SUPPLY YES NO
Did you conrm that the electricity is supplied from 120 VAC, 60 Hz power source and is in a properly
grounded circuit?
Did you conrm that an extension cord or an adapter plug has NOT been used with the boiler?
COMMISSIONING YES NO
Was the boiler lled to 17-26 PSI?
Was the deaeraon process performed on the boiler?