Tech Bulletin
1 TB-160
6/2019
Technical Bullen 160 - Rinnai I-Series Boiler Combuson Analysis
PURPOSE: The purpose of this Technical Bullen is to communicate that the I-Series Condensing Boiler
does not require combuson analysis to be performed on the boiler at commissioning.
I-Series Condensing Boiler Models (Combi and Heat-Only) include:
Many modulang condensing boilers on the market require a combuson analysis test to be
performed on the boiler during the installaon and/or commissioning process. The O2/CO2
percentage would then be adjusted to a factory-specied value. Due to the innovave, self-
compensang zero governor gas valve integrated into the I-Series Boiler, a combuson analysis test is
not required.
Note: The proper gas supply pressure must sll be supplied to the boiler to ensure proper operaon.
The installaon must conform to the Boiler Installaon and Operaon Manual that is shipped with the
unit, local codes, or in the absence of local codes, with the Naonal Fuel Gas Code, ANSI Z223.1/NFPA
54, or the Natural Gas and Propane Installaon Code, CSA B149.1.