I Series Solo Installation Manual

74
Rinnai I-Series Condensing Boiler Solo Manual
IMPORTANT
On inial startup of the system, it is necessary to put the boiler into a deaeraon process to
remove all air from the system piping and boiler. Failure to properly deaerate the boiler
and system may result in damage to the boiler, which is not covered by the boiler
warranty.
It can take up to a week before all the air has disappeared from a newly-lled and
pressurized installaon. During the rst week of operaon, noises can be heard which
indicate the presence of air. The automac air vent in the boiler and air separator in the
heang system will remove the air, which means the water pressure will reduce some
during this period; therefore, addional water is necessary to maintain proper pressure in
the heang system. Water pressure needed for operaon:
The boiler is in normal operaon between 17 - 26 PSI (1.2 - 1.8 bar).
Below 7 PSI (0.5 bar), the boiler will have an error code (E430 diagnosc code will be
present on the controller display) and will not operate. Increasing the heang system
water pressure is necessary for operaon.
Between 7 - 13 PSI (0.5 - 0.9 bar), operaon will be limited (E430 diagnosc code will
be present on the controller display).
The maximum pressure permied inside the heat exchanger is 45 PSI (3.0 bar).
The pressure relief valve supplied with the boiler is rated to 30 PSI (2.1 bar).
Topics in this secon
Start-Up Informaon
Control Panel
Basic Operaon Sengs
Parameter Sengs
Outdoor Reset Control
Diagnosc Codes
Forced Hi/Lo Fire Modes
12