Installation Guide
Rinnai I-Series Condensing Boiler Combi Manual 87
Parameter
Number
Seng Descripon
Selecon
A b C d
40
Linked Operaon Between CH Pump 1 and 2
No
Yes (Linked
Together)
This parameter enables linked operaon
between the CH Pump 1 and 2. For example,
when T/T 1 is acve, both pump 1 and 2 are ON.
The room thermostat wire must be connected
to the T/T1 connecon.
When selecng DHW mode on DIP switch 3, the
parameter is not available and must in the OFF
posion (default).
This seng is primarily for an applicaon that
requires two pumps for one zone, such as in use
with a a header style applicaon.
41
Linked Operaon Between Main Boiler Pump
and CH Pump 1
No
Yes (Linked
Together)
(If selected,
hydraulic
separaon is
needed.)
This parameter is only in use when DIP switch 2
is in the ON posion.
This enables the linked operaon between the
main boiler pump and CH pump 1. For example,
when the main pump is on, pump 1 is also on.
When DIP switch 2 is in the OFF posion, the
pumps are automacally linked.
42
Main Pump Runs When the Target Temperature
is Achieved
Connuously Intervals
This selects the mode of the main pump running
when the target setpoint is achieved. This
seng is for whether running on intervals to
reduce pump operaon or connuously running
to reduce wait me to re-re. Intervals are 10
minutes ON and 30 minutes OFF.
Note: If an air handler is in use, use the default
seng “Connuously.”
43
External Pump Runs When the Setpoint
Temperature is Achieved
Same as Main
Pump
Does Not
Run
This selects the mode of the external pump(s)
running when the target setpoint is achieved.
This seng is for whether stopping the external
pump from running to reduce pump operaon
me or it operates the same as the main pump
to enable remaining heat from the heat
exchanger to be delivered to the system.