Tech Bulletin
TB-151(01)
1 10/2019
Technical Bullen 151 - Ubbink Flexible Venng for M-Series Boilers
PURPOSE: To announce the approval of Ubbink Rolux® exible vent system components with the following Rinnai
M-Series Boiler models:
Combi Solo
M060C
M090C
M120C
M160C
M060S
M090S
M120S
M160S
INSTALLATION REQUIREMENTS:
Vent Opons Room Air (Non-Direct Vent) applicaons ONLY.
NOT approved for outside combuson air (Direct Vent).
Diameter 2 in. (60 mm)
Material Polypropylene (PP)
DO NOT combine vent components from dierent manufacturers.
Maximum Equivalent
Vent Length
M060S, M060C, M090S—60 (18.3m)
M090C, M120S, M120C, M160S, M160C—30 (9.1m)
Terminaon Vercal only. DO NOT run or terminate horizontally as condensate will not drain properly.
Bending Condions • Bend radius: Must be larger than 7 in. (178 mm) (Figure 1)
• Angle: Do not install in angle over 45° to vercal (Figure 2)
Clearances 0 (zero) clearance to combusble materials.
Installaon
Temperatures
Do not install while ambient temperatures are below 41°F (5°C). In colder weather, pre-warm
ex venng prior to installaon.
Addional
Requirements
• Vent system connects to only one Rinnai M-Series Boiler.
• Ubbink Rolux® venng components must be used throughout the enre vent system.
Do not combine with vent components from other manufacturers.
• Do not store venng exposed to sunlight.
• Venng must be enclosed and used with a rigid PP pipe to connect to the boiler (Figure 3
on next page).
Approvals/Codes Installaon must conform to the Rinnai Installaon and Operaon Manual that is shipped with
the unit, local codes, or in the absence of local codes, with the Naonal Fuel Gas Code, ANSI
Z223.1/NFPA 54.
Less than 45° angle
Figure 1 Figure 2
Larger than
7 in. (178 mm)
Radius