Installation manual
Rinnai New Zealand Limited Neo Installation Manual: 11906-B
02-11
19
Freestanding installaons
3. Aach heater to base assembly and t back panel
Lift the Neo freestanding engine into position over the base assembly and x into position
using the four M5 x 10 screws supplied.
Remove the three screws from the base of the unit (do not discard) and screw the back
freestanding panel into position—nine screws in total.
Four screw posions for
securing the unit to the
base assembly
4. Add top and side panels
Install the freestanding top panel using three M5 x 10 and three self tapping screws. Install the
freestanding side panels (ensure you push up to minimise the gap) using six screws per side.
1
2
3
4
5
6
Three screws from unit base (screws 7,8 & 9)
Self tapping screws
M5 x 10 screws
Screw posions for
side panels
Minimise
gap